SF Prep

Infrastructure & Energy Current Affairs Quiz — Last 12 months

Daily news by your exam, state and topic — each with a short summary, key facts and MCQs.

7 days 1 month 3 months 6 months 12 months All
688 news · 1612 MCQs
Score: 0 / 0 attempted · 78 questions
Government brings SAF-blended aviation fuel under the ATF Control Order
Q1

India's indicative Sustainable Aviation Fuel (SAF) blending target in ATF for international flights for the year 2030 is:

Show answer

Correct answer: C — 5%

The indicative targets are 1% in 2027, 2% in 2028 and 5% in 2030.

Q2 Advanced

The amendment notified on 17 April 2026 to bring SAF-blended fuel under regulation was made to which instrument?

Show answer

Correct answer: D — Aviation Turbine Fuel (Regulation of Marketing) Order, 2001

The Government amended the ATF (Regulation of Marketing) Order, 2001, the ATF Control Order.

Q3 Advanced

Consider the following statements about CORSIA, cited in the April 2026 ATF Control Order amendment: 1. CORSIA is a scheme implemented by the International Civil Aviation Organization to control emissions from international flights. 2. The mandatory phase of CORSIA begins from 2030. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: the mandatory phase begins from 2027, requiring international flights to offset emissions above a baseline.

Kankaria Coaching Depot in Ahmedabad becomes India's first water-neutral coaching depot
Q4

India's first water-neutral coaching depot, announced by the Railways in April 2026, is located in:

Show answer

Correct answer: D — Ahmedabad

The Kankaria Coaching Depot is in Ahmedabad, Gujarat.

Q5 Advanced

The wastewater treatment at the Kankaria Coaching Depot is based on 'phytoremediation'. This refers to:

Show answer

Correct answer: A — Use of plants to remove impurities from water

Phytoremediation is a natural process where plants are used to purify water; the depot uses a wetland-based system.

Operational Guidelines launched for ₹1 lakh crore Urban Challenge Fund and its Credit Repayment Guarantee Sub-Scheme
Q6

What is the total central assistance under the Urban Challenge Fund, whose Operational Guidelines were launched on 15 April 2026?

Show answer

Correct answer: A — ₹1 lakh crore

The UCF has central assistance of ₹1 lakh crore; ₹4 lakh crore is the total urban investment it aims to catalyse.

Q7 Advanced

Consider the following statements about the Urban Challenge Fund: 1. Central assistance is limited to 25% of project cost. 2. At least 50% of project funding is to be mobilised through municipal bonds, bank loans and public-private partnerships. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both statements are correct as per MoHUA.

Q8 Advanced

How much of the Urban Challenge Fund outlay is earmarked for the Credit Repayment Guarantee Sub-Scheme (CRGSS)?

Show answer

Correct answer: D — ₹5,000 crore

₹5,000 crore is earmarked for the CRGSS; another ₹5,000 crore is for project preparation and capacity building, and ₹90,000 crore for projects.

NHAI directs FASTag issuer banks to validate vehicle registration numbers ahead of Multi-Lane Free Flow tolling
Q9 Advanced

NHAI said many FASTag–number plate mismatches involve FASTags issued before FASTag issuance was integrated with which database?

Show answer

Correct answer: B — VAHAN

NHAI said many mismatches relate to FASTags issued before integration with the VAHAN database, when validation was largely manual.

Q10 Advanced

Consider the following statements about NHAI's April 2026 FASTag directive: 1. FASTag issuer banks must blacklist FASTags found linked to incorrect or invalid vehicle registration numbers. 2. Under Multi-Lane Free Flow tolling, e-Notices to non-compliant vehicles will depend on accurate vehicle identification data. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both statements are correct as per the NHAI release.

PM inaugurates 213-km Delhi–Dehradun Economic Corridor; travel time to fall to about 2.5 hours
Q11

What is the length of the Delhi–Dehradun Economic Corridor inaugurated on 14 April 2026?

Show answer

Correct answer: B — 213 km

BusinessLine, The Statesman and CNBC-TV18 all report a length of 213 km.

Q12 Advanced

Consider the following statements about the Delhi–Dehradun Economic Corridor: 1. It is a six-lane, access-controlled corridor built at a cost of over ₹12,000 crore. 2. It passes through Delhi, Uttar Pradesh and Uttarakhand. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both statements are correct as reported by BusinessLine, The Statesman and CNBC-TV18.

Q13 Advanced

The Prime Minister highlighted an elevated wildlife corridor built as part of the Delhi–Dehradun expressway so that animals including elephants face no disruption. What is its approximate length, as stated by PIB?

Show answer

Correct answer: A — About 12 km

PIB says a nearly 12-kilometre elevated wildlife corridor has been built as part of the expressway.

MoRTH notifies new fee structure for overloaded vehicles on National Highways from 15 April
Q14

Under the National Highways Fee (Fourth Amendment) Rules, 2026, up to what level of excess load is no overload fee charged?

Show answer

Correct answer: B — 10%

No overload fee is charged for excess load up to 10%.

Q15 Advanced

Under the revised rules effective 15 April 2026, a vehicle carrying more than 40% excess load on a National Highway is charged:

Show answer

Correct answer: C — Four times the base rate

Above 40% excess load, the fee is four times the base rate; over 10% and up to 40% it is twice the base rate.

Q16 Advanced

Consider the following statements about the overload fee rules for National Highways notified in April 2026: 1. Overload fees are to be collected only through FASTag. 2. Where a fee plaza has no weighment facility, the overload fee is charged on the vehicle's declared Gross Vehicle Weight. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: where weighment facilities are not available at a fee plaza, no overload fee is levied.

Indian Railways sanctioned 100 projects worth ₹1.53 lakh crore in FY 2025–26
Q17

How many railway projects were sanctioned by Indian Railways in FY 2025–26, as per the Ministry of Railways?

Show answer

Correct answer: B — 100

100 projects worth ₹1.53 lakh crore covering over 6,000 km were sanctioned in FY 2025–26.

Q18 Advanced

The Rowghat–Jagdalpur railway line, highlighted as a tribal-area connectivity project among FY 2025–26 sanctions, is in which State?

Show answer

Correct answer: C — Chhattisgarh

The Rowghat–Jagdalpur line is in Chhattisgarh.

Q19 Advanced

Consider the following statements about railway project sanctions: 1. In FY 2024–25, 64 projects worth ₹72,869 crore were sanctioned. 2. Among States, Bihar received the highest number of projects sanctioned in FY 2025–26. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: Maharashtra had the most projects (17), followed by Bihar (11).

West Asia update: LPG vessel Jag Vikram crosses Strait of Hormuz; 2,009 seafarers repatriated
Q20

Which India-flagged LPG vessel, carrying about 20,400 MT of LPG, safely crossed the Strait of Hormuz as reported on 11 April 2026?

Show answer

Correct answer: A — Jag Vikram

The India-flagged LPG vessel Jag Vikram, carrying about 20,400 MT of LPG, safely crossed the Strait of Hormuz.

Q21 Advanced

As part of LPG demand rationalisation during the West Asia situation, the urban LPG booking interval was increased:

Show answer

Correct answer: B — From 21 to 25 days

The booking interval was increased from 21 to 25 days in urban areas and up to 45 days in rural areas.

Q22 Advanced

Under which instruments are State Governments empowered to act against hoarding and black marketing of petroleum products, as cited in the 11 April 2026 update?

Show answer

Correct answer: C — Essential Commodities Act, 1955 and LPG Control Order, 2000

States are empowered under the Essential Commodities Act, 1955 and the LPG Control Order, 2000.

Manohar Lal attends dam concrete pour at Punatsangchhu-I hydropower project in Bhutan
Q23 Advanced

Which hydropower project in Bhutan, described as the largest India-Bhutan joint hydropower venture, marked the pour of concrete of its dam on 10 April 2026?

Show answer

Correct answer: A — Punatsangchhu-I

The dam concrete pour ceremony was held at Punatsangchhu-I, the largest joint hydropower venture between the two countries.

Q24 Advanced

The Punatsangchhu-II hydropower project in Bhutan was jointly inaugurated by PM Narendra Modi and King Jigme Khesar Namgyel Wangchuck on:

Show answer

Correct answer: D — 11 November 2025

Punatsangchhu-II was jointly inaugurated on 11 November 2025.

National Highway fee plazas move to digital-only toll payments from 10 April 2026
Q25

From 10 April 2026, user fee at National Highway fee plazas is to be paid only through:

Show answer

Correct answer: A — FASTag or UPI

Payments are processed exclusively through FASTag or UPI.

Q26 Advanced

The digital-only toll collection from 10 April 2026 was NOT implemented in which of the following, due to the Model Code of Conduct?

Show answer

Correct answer: B — Puducherry

It was not implemented in Tamil Nadu, Kerala, Assam, West Bengal and the UT of Puducherry due to the Model Code of Conduct.

Railways to use composite sleepers on bridge approaches and points & crossings
Q27

Where will Indian Railways now use composite sleepers, as decided on 9 April 2026?

Show answer

Correct answer: A — Bridge approaches and points & crossings

The Railways said sleepers used on bridge approaches and at points & crossings will now be composite.

Q28 Advanced

Which new technique did the Railways decide to use to identify minute defects in welded joints of tracks?

Show answer

Correct answer: C — Magnetic Particle Testing

The Railways decided to use Magnetic Particle Testing for welds; Ground Penetration Radar is for assessing the track base.

CCEA clears Kalai-II (1,200 MW) and Kamala (1,720 MW) hydro projects in Arunachal Pradesh
Q29

The 1,200 MW Kalai-II Hydro Electric Project, approved by the CCEA on 8 April 2026, is on which river?

Show answer

Correct answer: C — Lohit

The CCEA approved Kalai-II on the Lohit river in Anjaw district; it is the first hydro project in the Lohit basin.

Q30 Advanced

Consider the following statements about the hydro projects approved on 8 April 2026: 1. Kalai-II will be implemented through a joint venture of THDC India Limited and the Government of Arunachal Pradesh. 2. Kamala HEP will be implemented through a joint venture of NTPC Limited and the Government of Arunachal Pradesh. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: Kamala HEP will be implemented by a joint venture of NHPC Limited (not NTPC) and the state government.

Q31 Advanced

Under the Kalai-II and Kamala projects, what share of power will Arunachal Pradesh receive free, plus how much for the Local Area Development Fund?

Show answer

Correct answer: B — 12% free power + 1% for LADF

For both projects the state will receive 12% free power and an additional 1% earmarked for the Local Area Development Fund.

Cabinet approves Jaipur Metro Phase-2: 41-km North–South corridor
Q32

Jaipur Metro Phase-2, approved by the Union Cabinet on 8 April 2026, will be a North–South corridor of what length and how many stations?

Show answer

Correct answer: B — 41 km, 36 stations

The Cabinet approved a 41-km North–South corridor from Prahladpura to Todi Mod with 36 stations. 11.64 km with 11 stations is Phase-1.

Q33 Advanced

Consider the following statements about Jaipur Metro: 1. Phase-2 will be implemented by Rajasthan Metro Rail Corporation Limited, a 50:50 joint venture of the Government of India and the Government of Rajasthan. 2. The operational Phase-1 runs along a North–South axis from Prahladpura to Todi Mod. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: Phase-1 runs East–West from Mansarovar to Badi Chaupar; Prahladpura–Todi Mod is the new North–South Phase-2.

Q34 Advanced

By when is Jaipur Metro Phase-2 targeted for completion?

Show answer

Correct answer: C — September 2031

The Cabinet release says Phase-2 is targeted for completion by September 2031.

Delhi's unauthorised colonies to be regularised on an 'as-is where-is' basis
Q35

The 'as-is where-is' decision announced on 7 April 2026 enables regularisation of how many of Delhi's 1,731 unauthorised colonies?

Show answer

Correct answer: A — 1,511

Delhi CM Rekha Gupta said regularisation of 1,511 out of 1,731 unauthorised colonies has been enabled.

Q36 Advanced

In which year was PM-UDAY (Pradhan Mantri – Unauthorised Colonies in Delhi Awas Adhikar Yojana) launched?

Show answer

Correct answer: B — 2019

The Housing Ministry said PM-UDAY was launched on 29 October 2019, after the 2019 Regulations were notified that month.

Q37 Advanced

Consider the following statements about the regularisation of Delhi's unauthorised colonies announced in April 2026: 1. Applications on the SWAGAM portal will be accepted from 24 April 2026. 2. Conveyance deeds are to be issued within 45 days. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Housing Ministry release: applications open on 24 April, and the timeline includes conveyance deeds within 45 days.

Railways approves ₹1,364.45 crore for Kavach and signalling upgrades
Q38

What is the total value of the safety, signalling and communication works approved by Indian Railways, as announced on 6 April 2026?

Show answer

Correct answer: A — ₹1,364.45 crore

The Ministry of Railways said projects worth ₹1,364.45 crore were approved. ₹2,950 crore and ₹4,871 crore are sub-umbrella and umbrella figures, and ₹27,693 crore is the Kavach umbrella work.

Q39 Advanced

Which version of Kavach equipment is to be installed on 232 Southern Railway locomotives under the works approved in April 2026?

Show answer

Correct answer: B — Version 4.0

The ministry said the work covers installation of Kavach Version 4.0 equipment on 232 locomotives.

Q40 Advanced

Electronic interlocking worth ₹578.02 crore is to replace panel interlocking at 49 stations in which railway zone?

Show answer

Correct answer: D — South Central Railway

The ministry said electronic interlocking at 49 stations on high-density routes is in South Central Railway.

West Asia situation: government steps up LPG safeguards, over 7 lakh return to India
Q41

What share of LPG deliveries were Delivery Authentication Code (DAC) based as per the government update of 5 April 2026?

Show answer

Correct answer: B — 90%

The update said DAC-based deliveries rose from 53% in February 2026 to 90%.

Q42 Advanced

To what was the LPG cylinder booking interval in urban areas raised, as part of the measures noted on 5 April 2026?

Show answer

Correct answer: D — 25 days

The update said the interval was raised from 21 to 25 days in urban areas and up to 45 days in rural areas.

Q43 Advanced

According to the 5 April 2026 update, how many passengers had returned to India from the West Asia region since 28 February?

Show answer

Correct answer: A — Over 7,02,000

The update said over 7,02,000 passengers had returned to India since 28 February.

Major ports handle a record 915.17 million tonnes of cargo in 2025-26
Q44

How much cargo did India's Major Ports handle in 2025-26, as reported by the Ports Ministry on 5 April 2026?

Show answer

Correct answer: A — 915.17 million tonnes

The ministry said Major Ports handled 915.17 MT, surpassing the annual target of 904 MT.

Q45 Advanced

Which Major Port was the top performer by cargo volume in 2025-26?

Show answer

Correct answer: C — Deendayal Port Authority

Deendayal Port Authority handled 160.11 MT, ahead of Paradip (156.45 MT) and JNPA (102.01 MT).

Q46 Advanced

Which Major Port recorded the highest growth rate in cargo handling in 2025-26?

Show answer

Correct answer: B — Mormugao Port Authority

Mormugao Port Authority grew 15.91%, followed by Kolkata Dock System (14.28%) and JNPA (10.74%).

Indian Railways posts record 1,670 MT freight loading in 2025-26
Q47

What record freight loading did Indian Railways achieve in 2025-26?

Show answer

Correct answer: C — 1,670 million tonnes

The Railway Ministry said freight loading reached a historic high of 1,670 million tonnes.

Q48 Advanced

How many locomotives did Indian Railways produce in 2025-26?

Show answer

Correct answer: A — 1,674

The ministry said 1,674 locomotives were produced; 6,677 is the number of LHB coaches.

Q49 Advanced

Consider the following statements about Indian Railways' performance in 2025-26: 1. The Kavach system has been commissioned over more than 3,100 route km. 2. 35 stations were redeveloped under the Amrit Bharat Station Scheme during the year. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: 119 stations were redeveloped under the Amrit Bharat Station Scheme; 35 is the number of Gati Shakti Cargo Terminals commissioned.

Railways approves ₹398.36 crore fibre backbone for Ahmedabad and Ratlam divisions
Q50

What is the cost of the optical fibre cable backbone project approved for Western Railway's Ahmedabad and Ratlam divisions in April 2026?

Show answer

Correct answer: B — ₹398.36 crore

The Railway Ministry put the project cost at ₹398.36 crore; ₹2,800 crore is the Western Railway sub-umbrella.

Q51 Advanced

The ₹398.36 crore optical fibre backbone sanctioned on 4 April 2026 covers which two divisions of Western Railway?

Show answer

Correct answer: D — Ahmedabad and Ratlam

The project covers 1,456 route km in Ahmedabad division and 473 route km in Ratlam division.

Railway Minister reviews zones, prioritises passenger experience and underpasses
Q52

At the review meeting on 3 April 2026, what did the Railway Minister direct officials to prioritise for crossing railway tracks?

Show answer

Correct answer: D — Convenient underpasses (puliyas) over foot overbridges

Ashwini Vaishnaw directed officials to give priority to convenient and accessible underpasses (puliyas) over foot overbridges.

Q53 Advanced

Consider the following statements about the Railway Minister's review of 3 April 2026: 1. He asked officials to resolve railway land encroachment with a humane approach so that livelihoods are not affected. 2. He described railway stations as the face of Indian Railways. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Railway Ministry release.

₹132.51 crore Road Over Bridge approved at Deendayal Port, Kandla
Q54

What is the estimated cost of the Road Over Bridge at LC-235 approved for Deendayal Port Authority, Kandla?

Show answer

Correct answer: B — ₹132.51 crore

The Ports Ministry put the project cost at ₹132.51 crore.

Q55 Advanced

Which agency is constructing the Road Over Bridge at LC-235 at Deendayal Port on a deposit basis?

Show answer

Correct answer: C — Western Railway

The ministry said the construction is being undertaken by Western Railway on a deposit basis.

Cost escalation relief for National Highway contractors from 1 April to 30 June 2026
Q56

For what period does the cost escalation compensation mechanism for National Highway projects, announced on 2 April 2026, apply?

Show answer

Correct answer: A — 1 April to 30 June 2026

MoRTH said the measures apply for three months, from 1 April till 30 June 2026, or until further review.

Q57 Advanced

Under the revised price adjustment for EPC highway contracts, the Wholesale Price Index will be taken for which period?

Show answer

Correct answer: C — One month before the Interim Payment Certificate month

MoRTH said WPI will now be taken for one month prior to the relevant IPC month, in place of three months prior.

Kandla Port conducts trial shore-to-ship methanol bunkering
Q58

Which Indian port conducted a trial shore-to-ship methanol bunkering operation on 2 April 2026?

Show answer

Correct answer: C — Deendayal Port (Kandla), Gujarat

The Ports Ministry said Kandla Port (Deendayal Port Authority) conducted the trial on 2 April 2026.

Q59 Advanced

Kandla Port was rated at which level on the IAPH Port Readiness Level scale for methanol bunkering?

Show answer

Correct answer: A — Level 6

After DNV's assessment, the port was rated Level 6 on the IAPH Port Readiness Level scale.

Q60 Advanced

Kandla Port is working to ensure about how much RFNBO-compliant e-methanol availability by 2028-29?

Show answer

Correct answer: D — 500 KTPA

The ministry said the port is working towards approximately 500 KTPA of RFNBO-compliant e-methanol by 2028-29.

BCGCL and MCL sign land lease for coal-to-ammonium nitrate project at Lakhanpur, Odisha
Q61

Where will the coal-to-ammonium nitrate project of Bharat Coal Gasification and Chemicals Ltd be set up?

Show answer

Correct answer: C — Lakhanpur, Odisha

The land lease signed on 1 April 2026 is for the project at Lakhanpur, Odisha.

Q62 Advanced

The Lakhanpur project will be India's first coal gasification project to use indigenously developed gasification technology from which company?

Show answer

Correct answer: A — Bharat Heavy Electricals Limited

The Coal Ministry said the project will deploy gasification technology indigenously developed by BHEL.

Green ammonia purchase and supply agreements exchanged for fertiliser sector under Green Hydrogen Mission
Q63

Which agency conducted the competitive bidding for supply of green ammonia to fertiliser units under the National Green Hydrogen Mission?

Show answer

Correct answer: D — Solar Energy Corporation of India (SECI)

SECI conducted competitive bidding for the supply of green ammonia to fertiliser units under the SIGHT programme.

Q64 Advanced

About how much green ammonia per annum was allocated to the fertiliser sector under the agreements exchanged on 30 March 2026?

Show answer

Correct answer: C — 7.24 lakh tonnes

Minister J P Nadda said about 7.24 lakh tonnes per annum of green ammonia had been allocated.

Q65 Advanced

Consider the following statements about the National Green Hydrogen Mission: 1. Its outlay is ₹19,744 crore. 2. It targets production of at least 5 MMT of green hydrogen per annum by 2030. Which of the above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

The Mission has an outlay of ₹19,744 crore and targets at least 5 MMT of green hydrogen per annum by 2030.

PM inaugurates Phase I of Noida International Airport at Jewar, built at about ₹11,200 crore
Q66

The Noida International Airport, whose Phase I was inaugurated on 28 March 2026, is located at:

Show answer

Correct answer: D — Jewar

PM Modi inaugurated the Noida International Airport at Jewar in Uttar Pradesh.

Q67 Advanced

Phase I of the Noida International Airport was developed with an investment of around:

Show answer

Correct answer: B — ₹11,200 crore

Phase I was developed with an investment of around ₹11,200 crore.

Q68 Advanced

At the Noida airport inauguration, the PM laid the foundation stone of which facility at Jewar, noting that 85% of Indian aircraft go abroad for it?

Show answer

Correct answer: B — Maintenance, Repair and Overhaul (MRO) facility

The PM said 85% of Indian aircraft still go abroad for MRO services and laid the foundation stone of an MRO facility at Jewar.

Q69 Advanced

Consider the following statements made at the Noida International Airport inauguration (March 2026): 1. The Jewar airport project was first approved in 2003. 2. Uttar Pradesh now has 17 airports. 3. India now has more than 300 airports. Which of the above are correct?

Show answer

Correct answer: A — 1 and 2 only

The PM said the airport was approved by Atal ji in 2003 and that UP's airports have increased to 17. He said India has more than 160 airports, not 300.

NHAI awards ₹1,734 crore contract to four-lane Gudebellur–Mahabubnagar stretch of NH-167 in Telangana
Q70 Advanced

The Gudebellur–Mahabubnagar section of NH-167, awarded for four-laning in March 2026, is part of which economic corridor?

Show answer

Correct answer: D — Hyderabad–Panaji Economic Corridor

The 80 km project is part of the Hyderabad–Panaji Economic Corridor.

Q71 Advanced

The NH-167 Gudebellur–Mahabubnagar four-laning contract (₹1,734 crore) has been awarded under which mode?

Show answer

Correct answer: C — Hybrid Annuity Mode

It was awarded to KNR Constructions Ltd on Hybrid Annuity Mode (HAM).

NHAI awards contract for flyovers and underpasses at Jaipur Bypass Junction on NH-48
Q72

The Jaipur Bypass (200 Feet) Junction, where NHAI awarded a contract for flyovers and underpasses in March 2026, lies on which national highway?

Show answer

Correct answer: B — NH-48

The junction is on the Delhi–Jaipur–Ajmer stretch of NH-48 in Rajasthan.

Railway Minister reviews Kavach: installed on 3,103 route km, Universal Braking Algorithm and AI platform 'SURAKSHA' developed
Q73

Kavach, reviewed by the Railway Minister in March 2026, is India's indigenous:

Show answer

Correct answer: A — Automatic Train Protection system

Kavach is the indigenously developed Automatic Train Protection (ATP) system of Indian Railways.

Q74 Advanced

What is 'SURAKSHA', announced in the March 2026 Kavach review?

Show answer

Correct answer: B — An AI-based centralised monitoring platform for Kavach

SURAKSHA is being developed as an AI-based centralised Operations Management System for real-time monitoring and predictive maintenance of Kavach.

Q75 Advanced

As of March 2026, Kavach had been installed on approximately how many route kilometres?

Show answer

Correct answer: B — 3,103

Kavach has been installed on 3,103 route km; work is in progress on 24,427 route km, and 1,638 route km are commissioned under version 4.0.

Cabinet approves Modified UDAN with ₹28,840 crore outlay for 2026-27 to 2035-36
Q76

What is the total outlay of the Modified UDAN scheme approved by the Union Cabinet in March 2026?

Show answer

Correct answer: A — ₹28,840 crore

Modified UDAN has a total outlay of ₹28,840 crore for FY 2026-27 to FY 2035-36. ₹12,159 crore is the airport-development component.

Q77 Advanced

Consider the following about the Modified UDAN scheme (2026): 1. It proposes to develop 100 airports from existing unserved airstrips. 2. It proposes 200 modern helipads focused on priority and aspirational districts. 3. It will run for five years from FY 2026-27. Which of the above is/are correct?

Show answer

Correct answer: B — 1 and 2 only

The scheme runs for ten years (FY 2026-27 to 2035-36), so statement 3 is wrong; 100 airports and 200 helipads are both components.

Q78 Advanced

Under Modified UDAN, aircraft are to be procured from HAL for which two operators?

Show answer

Correct answer: A — Pawan Hans and Alliance Air

Two HAL Dhruv helicopters will go to Pawan Hans and two HAL Dornier aircraft to Alliance Air, under the Atmanirbhar Bharat component.