Infrastructure & Energy Current Affairs Quiz — Last 6 months

Daily news by your exam, state and topic — each with a short summary, key facts and MCQs.

7 days 1 month 3 months 6 months 12 months All
264 news · 614 MCQs
Score: 0 / 0 attempted · 67 questions
Hardeep Singh Puri launches ₹23,731-crore GOBARdhan scheme for compressed biogas
Q1

What is the outlay of the GOBARdhan Central Sector Scheme for compressed biogas launched on 1 October 2026?

Show answer

Correct answer: D — ₹23,731 crore

The scheme was approved by the Union Cabinet on 6 August 2026 with an outlay of ₹23,731 crore.

Q2 Advanced

Consider the following statements about the GOBARdhan scheme (2026): 1. It is a ten-year framework from FY 2026-27 to FY 2035-36. 2. It is implemented by the Ministry of Jal Shakti. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

GOBARdhan provides a ten-year framework from FY 2026-27 to FY 2035-36 and was launched by the Ministry of Petroleum and Natural Gas, not Jal Shakti.

Q3 Advanced

What administered price of compressed biogas is fixed under the GOBARdhan scheme?

Show answer

Correct answer: A — ₹2,110 per MMBtu

The scheme introduces an administered CBG price of ₹2,110 per MMBtu.

Q4 Advanced

Under GOBARdhan, the CBG procurement obligation on City Gas Distribution entities from FY 2028-29 onwards is:

Show answer

Correct answer: D — 5%

The CBG Obligation is 3% in FY 2026-27, 4% in FY 2027-28 and 5% from FY 2028-29 onwards.

Q5 Advanced

Under the GOBARdhan credit guarantee, what is the guarantee cap per project for women-led MSME CBG projects?

Show answer

Correct answer: A — ₹25 crore

The guarantee cap is ₹20 crore per project for general MSME projects and ₹25 crore for women-led MSME projects.

NHAI rolls out Tamil Nadu's first barrier-less Multi-Lane Free Flow toll at Paranur
Q6

Tamil Nadu's first Multi-Lane Free Flow (MLFF) tolling system, rolled out by NHAI in October 2026, is at which toll plaza?

Show answer

Correct answer: D — Paranur

NHAI rolled out Tamil Nadu's first MLFF system at Paranur Toll Plaza on the Tambaram–Tindivanam section of NH-179B.

Q7 Advanced

Which two technologies does the Multi-Lane Free Flow tolling at Paranur (Tamil Nadu) use to collect toll without stopping vehicles?

Show answer

Correct answer: B — ANPR and FASTag

The MLFF system uses Automatic Number Plate Recognition (ANPR) and FASTag-based electronic toll collection.

₹10,520-crore Amended BharatNet agreement signed for Maharashtra
Q8

How much financial support was approved for the Amended BharatNet Program in Maharashtra (agreement signed 1 October 2026)?

Show answer

Correct answer: C — ₹10,520 crore

₹10,520 crore financial support was approved for rolling out the Amended BharatNet Program in Maharashtra.

Q9 Advanced

The Amended BharatNet Program agreement for Maharashtra (October 2026) was signed on behalf of the Department of Telecommunications by:

Show answer

Correct answer: B — Digital Bharat Nidhi

Digital Bharat Nidhi (DBN) under DoT signed the agreement with the Maharashtra government, MDIL, BSNL and MahaIT.

Cabinet approves Green Energy Corridor Phase-III with 50 GWh battery storage; outlay ₹1,86,405 crore
Q10

Green Energy Corridor Phase-III, approved by the Cabinet in September 2026, aims to enable evacuation of up to how much renewable energy through intra-state transmission?

Show answer

Correct answer: D — 135 GW

GEC-III will strengthen the Intra-State Transmission System to evacuate up to 135 GW of renewable energy.

Q11 Advanced

How much Battery Energy Storage System (BESS) capacity is provided under Green Energy Corridor Phase-III?

Show answer

Correct answer: D — 50 GWh

The scheme provides for deployment of 50 GWh of BESS, with ₹50,000 crore earmarked for it.

Q12 Advanced

What is the total outlay of Green Energy Corridor Phase-III approved on 30 September 2026?

Show answer

Correct answer: D — ₹1,86,405 crore

Total outlay is ₹1,86,405 crore (₹1,36,378 crore InSTS + ₹50,000 crore BESS); ₹54,082 crore is the Central Financial Support.

Q13 Advanced

Consider the following statements about Green Energy Corridor Phase-III: 1. State Transmission Utilities will be the overall implementing agency. 2. The scheme is targeted to be set up by FY 2029-30. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

State Transmission Utilities are the overall implementing agency, but the scheme's target year is FY 2032-33, not 2029-30.

Ministry of Power notifies new CAFE norms for cars from 1 April 2027 to 31 March 2032
Q14

Which Union Ministry notified the new Corporate Average Fuel Economy (CAFE) norms for passenger vehicles in September 2026?

Show answer

Correct answer: C — Ministry of Power

The Ministry of Power notified the new CAFE norms, effective from 1 April 2027 to 31 March 2032.

Q15 Advanced

Consider the following statements about the new CAFE norms notified in September 2026: 1. They tighten the fuel-consumption benchmark by around 16.7% over five years. 2. The reference weight has been reduced from 1,229 kg to 1,082 kg. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

The benchmark tightens from 3.996 to 3.3273 L/100 km (~16.7%); the reference weight was increased from 1,082 kg to 1,229 kg, not reduced.

Bihar Cabinet approves Bihar Green Hydrogen Policy, 2026
Q16

Which state's Cabinet approved a 'Green Hydrogen Policy, 2026' on 30 September 2026, with its renewable energy development agency as nodal agency?

Show answer

Correct answer: A — Bihar

The Bihar Cabinet approved the draft Bihar Green Hydrogen Policy, 2026; BREDA is the nodal agency.

Q17 Advanced

The Bihar Green Hydrogen Policy, 2026 is aligned with the National Green Hydrogen Mission, which the Centre launched in which year?

Show answer

Correct answer: C — 2023

The Hindu reported the policy is in line with the National Green Hydrogen Mission launched by the Centre in 2023.

Cabinet approves ₹1,789.52-crore Intelligent Traffic Management System for Delhi
Q18

The Intelligent Traffic Management System for Delhi approved by the CCEA in September 2026 will be implemented by:

Show answer

Correct answer: D — Delhi Police

The CCEA approved implementation of the ITMS project by Delhi Police at ₹1,789.52 crore.

Q19 Advanced

How many traffic corridors of Delhi will the Intelligent Traffic Management System (approved September 2026) cover?

Show answer

Correct answer: D — 42

The ITMS will cover 42 identified traffic corridors in three phases over 24 months.

Amit Shah inaugurates Barapullah Elevated Road Phase-3 among Delhi projects worth over ₹1,941 crore
Q20

Barapullah Elevated Road Phase-3, inaugurated by Amit Shah on 29 September 2026, is located in which city?

Show answer

Correct answer: B — Delhi

Barapullah Elevated Road Phase-3 in Delhi provides signal-free connectivity between East and South Delhi.

Q21 Advanced

What is the cost of Barapullah Elevated Road Phase-3, inaugurated in September 2026?

Show answer

Correct answer: B — ₹1,635 crore

Phase-3 cost ₹1,635 crore; the total package of projects was worth over ₹1,941 crore.

DGCA issues Civil Aviation Requirement on syllabus for gyroplane pilot licence
Q22 Advanced

In September 2026 DGCA issued a Civil Aviation Requirement (CAR Section 7, Series B, Part XXI) setting the syllabus for a pilot licence for which type of aircraft?

Show answer

Correct answer: B — Gyroplanes

CAR Section 7, Series B, Part XXI sets out the syllabus for the gyroplane pilot licence.

Railways approve two new MEMU services linking Meerut City with Khurja and Saharanpur in Uttar Pradesh
Q23

The two new MEMU services approved by Indian Railways on 29 September 2026 connect Meerut City with which two stations?

Show answer

Correct answer: A — Khurja and Saharanpur

The services are Khurja–Meerut City (64573/64574) and Saharanpur–Meerut City (64580/64579).

Kolkata to host India Energy Week 2027 from 28 to 31 January
Q24

Which city will host India Energy Week 2027?

Show answer

Correct answer: C — Kolkata

Kolkata will host IEW 2027 from 28 to 31 January 2027 at the New Town Convention Centre.

Q25 Advanced

Which edition of India Energy Week will be held in Kolkata in January 2027?

Show answer

Correct answer: C — Fifth

IEW 2027 is the fifth edition; IEW debuted in Bengaluru in 2023 and the fourth edition was in Goa in 2026.

FASTag Annual Pass crosses one crore passes
Q26

The FASTag Annual Pass, which crossed one crore passes in September 2026, was launched on which date?

Show answer

Correct answer: A — 15 August 2025

The FASTag Annual Pass was launched on 15 August 2025.

Q27 Advanced

The FASTag Annual Pass is valid for one year or how many toll plaza crossings, whichever is earlier?

Show answer

Correct answer: C — 200

A one-time fee of ₹3,075 gives one year's validity or 200 toll plaza crossings.

Railways approve new tri-weekly Machilipatnam–Kurnool City Express via Vijayawada
Q28 Advanced

The new tri-weekly express approved on 28 September 2026 connects Kurnool City with which coastal town of Andhra Pradesh via Vijayawada?

Show answer

Correct answer: B — Machilipatnam

The Machilipatnam–Kurnool City Express runs 499 km via Vijayawada on South Coast Railway.

Railways approve ₹122 crore Barbil–Bolanikhadan doubling on iron ore corridor
Q29 Advanced

The Barbil–Bolanikhadan doubling project approved in September 2026 mainly serves the movement of which commodity?

Show answer

Correct answer: B — Iron ore and pellets

The section carries high-grade iron ore and pellets from SAIL's Bolani mines and private sidings to steel plants and ports.

Railways approve ₹223 crore for Kavach 4.0 on 614.75 route km of Varanasi Division
Q30 Advanced

In September 2026 Indian Railways approved Kavach 4.0 on 614.75 route km of which division?

Show answer

Correct answer: B — Varanasi Division

Kavach 4.0 was approved on 614.75 route km of the Varanasi Division of North Eastern Railway at ₹223 crore.

NMDC commissions 2 MTPA pellet plant at Nagarnar as part of ₹5,427 crore iron ore project in Bastar
Q31 Advanced

NMDC's 2 MTPA pellet plant commissioned in September 2026 is located at which place in Chhattisgarh?

Show answer

Correct answer: B — Nagarnar

The pellet plant is at Nagarnar, Bastar, linked by a 135 km slurry pipeline to Bacheli.

Q32 Advanced

How long is the slurry pipeline in NMDC's ₹5,427 crore project, carrying iron ore concentrate from Bacheli to Nagarnar?

Show answer

Correct answer: C — 135 km

The 135 km, 15 MTPA slurry pipeline carries concentrate from Bacheli to Nagarnar instead of by road.

Q33 Advanced

Consider the following statements about the NMDC project commissioned in 2026: 1. The pellet plant uses Straight Grate Induration technology. 2. It processes fines and slimes from the Bailadila mines. Which of the above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Ministry of Steel release.

Amit Shah flags off India's first LNG-powered train from Sabarmati, opens ₹1,472 crore projects in Ahmedabad
Q34

India's first LNG-powered train was flagged off on 27 September 2026 from which railway station?

Show answer

Correct answer: D — Sabarmati

Amit Shah flagged off the country's first LNG-powered train from Sabarmati Railway Station in Ahmedabad.

Q35 Advanced

A maintenance shed for which class of 12,000-hp twin-section locomotives was inaugurated at Sabarmati in September 2026?

Show answer

Correct answer: C — WAG-12

Shah inaugurated the WAG-12 maintenance shed; one WAG-12 can haul nearly as much freight as 600 trucks.

Q36 Advanced

Consider the following statements made by Amit Shah at Sabarmati (2026): 1. Railway diesel consumption fell to 108 crore litres in 2024–25. 2. Railway electrification has reached 100%. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct (down from 293 crore litres in 2015–16). Statement 2 is wrong: electrification stands at 99.6%, with 0.4% remaining.

Foundation stone laid for India's first port-based e-methanol plant at Deendayal Port, Kandla
Q37

India's first port-based e-methanol plant, whose foundation stone was laid on 26 September 2026, is located at which port?

Show answer

Correct answer: B — Deendayal Port, Kandla

The plant is coming up at Deendayal Port Authority, Kandla, Gandhidham, Gujarat.

Q38 Advanced

Which company is Deendayal Port Authority's partner in the Kandla e-methanol project?

Show answer

Correct answer: D — Assam Petro-Chemicals Ltd

The project is a joint initiative of DPA and Namrup-based Assam Petro-Chemicals Ltd (APCL).

Q39 Advanced

What is the planned total capacity of the Kandla e-methanol plant?

Show answer

Correct answer: A — 150 tonnes per day

Total capacity is 150 TPD: Phase I adds 50 TPD and Phase II a further 100 TPD.

Q40 Advanced

Consider the following statements about the Kandla e-methanol plant: 1. Deendayal Port Authority and its partner share capital equally (50:50). 2. The plant is expected to produce e-methanol at about US$1,300 per tonne. Which of the above is/are correct?

Show answer

Correct answer: D — Neither 1 nor 2

Both are wrong. The DPA:APCL capital ratio is 76:24, and the expected cost is about US$750 per tonne; US$1,300 is the global rate.

Foundation stone laid for ₹108 crore four-lane road over bridge between Guntur and Nambur
Q41

The ₹108 crore four-lane road over bridge between Guntur and Nambur, whose foundation stone was laid on 26 September 2026, is in which state?

Show answer

Correct answer: A — Andhra Pradesh

Guntur and Nambur are in Andhra Pradesh; the ROB will eliminate Level Crossing Gate No. 3.

Railways approves ₹166.5 crore four-lane road over bridge at Alkapuri, Vadodara
Q42

The ₹166.5 crore four-lane Road Over Bridge at Alkapuri approved by Indian Railways in September 2026 is in which city?

Show answer

Correct answer: B — Vadodara

The Alkapuri ROB is in Vadodara Division of Western Railway, Gujarat.

Kavach 4.0 commissioned for the first time on South Central Railway over 108 route km
Q43

Kavach 4.0 was commissioned for the first time on South Central Railway on which section?

Show answer

Correct answer: D — Malkajgiri–Kamareddi

Kavach was upgraded from Version 3.2 to 4.0 over 108 route km on the Malkajgiri–Kamareddi section of Hyderabad Division.

Q44 Advanced

Kavach, being upgraded to Version 4.0 by Indian Railways, is what kind of system?

Show answer

Correct answer: A — Automatic Train Protection system

Kavach is an indigenously developed Automatic Train Protection (ATP) system that helps the loco pilot keep trains within speed limits.

Q45 Advanced

Consider the following about Kavach 4.0: 1. Kavach 4.0 provides a station-to-station Kavach interface through optical fibre cable. 2. Kavach 4.0 can interface directly with existing electronic interlocking systems. Which of the above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are among the key improvements listed for Kavach 4.0, along with higher location accuracy and better signal information in bigger yards.

Next phase of UDAN: Civil Aviation Ministry signs 21 MoUs with States/UTs and launches Challenge Mode portal for aerodromes
Q46

How many MoUs did the Ministry of Civil Aviation sign with States/UTs on 22 September 2026 under the next phase of UDAN?

Show answer

Correct answer: D — 21

A total of 21 MoUs were signed between the Ministry, participating States/UTs and AAI.

Q47 Advanced

Which body is the implementing agency of the UDAN scheme?

Show answer

Correct answer: B — Airports Authority of India

The Airports Authority of India (AAI) is the implementing agency under UDAN and is a party to the 21 MoUs.

Q48 Advanced

As stated in September 2026, how many routes has UDAN operationalised since its launch?

Show answer

Correct answer: A — 687

UDAN has operationalised 687 routes and 95 aerodromes, with over 3.66 lakh flights.

Q49 Advanced

Consider the following about Modified UDAN: 1. Promotion of indigenous manufacturing is one of its four pillars. 2. Modified UDAN targets 120 new destinations over the next ten years. Which of the above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct. The four pillars are affordability, sustainability, a Challenge Mode framework and indigenous manufacturing; the MoS cited 120 new destinations and 4 crore more passengers over ten years.

Dallirajhara–Rowghat new rail line in Chhattisgarh completes final Taroki–Rowghat section; CRS inspection held
Q50

The Dallirajhara–Rowghat new rail line, whose final section was inspected by CRS on 22 September 2026, is in which state?

Show answer

Correct answer: D — Chhattisgarh

The line is under the Raipur Division of South East Central Railway in Chhattisgarh.

Q51 Advanced

The Dallirajhara–Rowghat line will help transport iron ore to which steel plant?

Show answer

Correct answer: B — Bhilai Steel Plant

The new line will facilitate iron ore transportation to the Bhilai Steel Plant.

Q52 Advanced

Consider the following about the Dallirajhara–Rowghat rail project: 1. The Taroki–Rowghat section is a double-line, non-electrified stretch. 2. The total length of the Dallirajhara–Rowghat line is 17.5 km. Which of the above is/are correct?

Show answer

Correct answer: D — Neither 1 nor 2

Neither is correct. Taroki–Rowghat is a single-line electrified broad-gauge section of 17.5 km; the whole Dallirajhara–Rowghat line is 95 km.

NHAI issues guidelines for design of access-controlled high-speed National Highways
Q53 Advanced

How many km of access-controlled high-speed corridors does the Viksit Bharat 2047 roadmap envisage, as cited by NHAI in September 2026?

Show answer

Correct answer: D — 50,000 km

The roadmap envisages 50,000 km of access-controlled high-speed corridors.

Q54 Advanced

Consider the following about NHAI's guidelines of September 2026: 1. The guidelines cover high-speed access-controlled National Highways other than Expressways. 2. The guidelines apply only to brownfield upgrades of existing highways. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: the guidelines apply to all upcoming 4/6-lane greenfield and brownfield corridors.

Coal India outlines diversification into coal gasification, power, renewables and critical minerals
Q55 Advanced

As per the Coal Ministry in September 2026, roughly how much is the total estimated cost of Coal India's four coal-to-chemicals projects?

Show answer

Correct answer: C — ₹69,346 crore

The four coal-to-chemicals initiatives together account for about ₹69,346 crore.

Q56

Talcher Fertilizers Ltd, a Coal India coal-to-chemicals project, is designed to produce which product?

Show answer

Correct answer: A — Urea

Talcher Fertilizers has a capacity of 1.27 MMTPA of urea; Bharat Coal Gasification & Chemicals is the ammonium nitrate project.

Q57 Advanced

Coal India's phased Underground Coal Gasification (UCG) pilot is being carried out at which site?

Show answer

Correct answer: D — Kasta West Block, Eastern Coalfields

The UCG pilot is at the Kasta West Block of Eastern Coalfields Ltd; Phase I was completed on 31 May 2025.

Q58 Advanced

Consider the following about Coal India's diversification portfolio (September 2026): 1. It includes a 2×800 MW ultra-supercritical expansion at Chandrapura. 2. It includes about 5,500 MW of commissioned solar capacity. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

Only 1 is correct. Coal India's commissioned solar capacity is about 550 MW, not 5,500 MW.

Nagpur's 8.9 km Indora Chowk–Dighori flyover, built with UHPFRC, inaugurated and named after Dr K.B. Hedgewar
Q59

The Indora Chowk–Dighori flyover in Nagpur, inaugurated on 19 September 2026, is to be named after whom?

Show answer

Correct answer: D — Dr Keshav Baliram Hedgewar

CM Devendra Fadnavis announced the flyover will be named after Dr Keshav Baliram Hedgewar to mark the RSS centenary year.

Q60 Advanced

Which construction technology was used for Nagpur's Indora Chowk–Dighori flyover to allow longer spans between piers?

Show answer

Correct answer: A — Ultra High Performance Fibre Reinforced Concrete (UHPFRC)

The flyover was built using UHPFRC, which allowed longer spans and fewer supports.

Q61 Advanced

Consider the following about the Indora Chowk–Dighori flyover: 1. The flyover is on National Highway 353D. 2. The flyover was built by the Maharashtra State Road Development Corporation. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

Only 1 is correct. The flyover was built by the National Highways Authority of India (NHAI).

Railways approve ₹252 crore for Kavach 4.0 on 607.7 route km of Lucknow Division
Q62

In September 2026, Indian Railways approved Kavach 4.0 on how many route kilometres of the Lucknow Division?

Show answer

Correct answer: C — 607.7 route km

Kavach 4.0 was approved on 607.7 route km of the Lucknow Division at a cost of ₹252 crore.

Q63 Advanced

Kavach, being installed on the Lucknow Division, is what kind of system?

Show answer

Correct answer: B — An indigenous Automatic Train Protection system

Kavach is an indigenously developed Automatic Train Protection (ATP) system that helps prevent Signal Passing at Danger.

Railways approve ₹142 crore to upgrade Savalyapuram–Guntur traction to 2x25 kV
Q64

In September 2026, Indian Railways approved upgrading the electric traction system from 1x25 kV to 2x25 kV on which section?

Show answer

Correct answer: C — Savalyapuram–Guntur

The ₹142 crore upgrade covers the 73 route km Savalyapuram–Guntur section of South Coast Railway.

Railways approve ₹493 crore for 38.21 km Mukutban–Gadchandur new line in Maharashtra
Q65

What is the length of the Mukutban–Gadchandur new rail line approved in September 2026?

Show answer

Correct answer: B — 38.21 km

The new line is 38.21 km long and will cost ₹493 crore.

Q66 Advanced

The Mukutban–Gadchandur new line falls under which railway zone?

Show answer

Correct answer: C — South Central Railway

The line was approved in South Central Railway.

Railways approve ₹497 crore doubling of 10.86 km Chouk–Karjat section in Maharashtra
Q67

What is the length of the Chouk–Karjat section approved for doubling in September 2026?

Show answer

Correct answer: A — 10.86 km

The Chouk–Karjat section is 10.86 km long; the doubling will cost ₹497 crore.