NHAI begins trial run of tunnel and underpasses on Dwarka Expressway's Delhi section
Q1 Advanced

What is the vehicle height restriction in the tunnel on the Delhi section of the Dwarka Expressway opened for trial in May 2025?

Show answer

Correct answer: B — 4.5 metres

NHAI said the tunnel has a vehicle height restriction of up to 4.5 metres.

Q2

The trial run of underpasses on the Dwarka Expressway in May 2025 aims to decongest the Delhi–Gurugram section of which national highway?

Show answer

Correct answer: D — NH-48

NHAI said the trial aims to decongest the Delhi–Gurugram section of NH-48.

India's coal imports fall 7.9% to 243.62 MT in FY 2024-25
Q3

By how much did India's coal imports fall in FY 2024-25 compared with FY 2023-24?

Show answer

Correct answer: A — 7.9%

Coal imports fell 7.9% to 243.62 MT. 8.95% is the fall for the non-regulated sector and 41.4% for blending imports by thermal plants; 5% is domestic output growth.

Q4 Advanced

Consider the following statements about coal in FY 2024-25: 1. Imports of coal for blending by thermal power plants fell by 41.4%. 2. Coal-based power generation declined during the year. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: coal-based power generation grew by 3.04%.

PM launches projects worth over ₹24,000 crore in Dahod; flags off first locomotive from Dahod factory
Q5

The Indian Railways locomotive manufacturing plant inaugurated at Dahod in May 2025 will produce electric locomotives of what power?

Show answer

Correct answer: C — 9,000 HP

The Dahod plant will produce 9,000 HP electric locomotives for domestic purposes and for export.

Q6 Advanced

Consider the following statements about the PM's programme in Dahod on 26 May 2025: 1. The PM announced that Gujarat had achieved 100% electrification of its railway network. 2. The PM flagged off a Vande Bharat Express between Dahod and Mumbai. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: the Vande Bharat Express flagged off runs between Veraval and Ahmedabad; an Express train was flagged off between Valsad and Dahod.

Q7

Speaking at Dahod on 26 May 2025, the Prime Minister noted that the date marked the anniversary of what?

Show answer

Correct answer: D — His first oath as Prime Minister in 2014

The PM remarked that 26 May marks the day he first took oath as Prime Minister in 2014.

PM launches projects worth over ₹53,400 crore in Bhuj, Kutch
Q8

Projects worth how much were launched by the Prime Minister in Bhuj, Gujarat on 26 May 2025?

Show answer

Correct answer: B — Over ₹53,400 crore

Projects worth over ₹53,400 crore were launched in Bhuj; the Dahod projects the same day were worth over ₹24,000 crore.

Q9 Advanced

Kandla, cited by the Prime Minister at Bhuj in May 2025, is one of how many designated green hydrogen hubs in India?

Show answer

Correct answer: B — Three

The PM noted that Kandla is one of the three designated green hydrogen hubs in the country.

Centre to consider Bengaluru Metro Phase-2 revised cost and Phase-3A after State approvals: Manohar Lal
Q10 Advanced

As per the Union Housing and Urban Affairs Ministry (May 2025), what are the proposed length and estimated cost of Bengaluru Metro Phase-3A?

Show answer

Correct answer: A — About 37 km, about ₹28,400 crore

Karnataka's Phase-3A proposal is about 37 km at about ₹28,400 crore; 45 km of Phase-3 was sanctioned at ₹15,600 crore.

Q11 Advanced

Consider the following statements about Bengaluru Metro as of May 2025: 1. Phase-3A has already been sanctioned by the Central Government. 2. About 145 km of metro network is operational in Bengaluru. Which of the statements given above is/are correct?

Show answer

Correct answer: D — Neither 1 nor 2

Both are wrong: Phase-3A is only proposed and its cost is to be examined; about 75 km is operational and about 145 km is under construction.

Curtain raiser for Wings India 2026; event to be held at Begumpet Airport, Hyderabad on 28–31 January 2026
Q12

Where and when is Wings India 2026, Asia's largest civil aviation event, scheduled to be held?

Show answer

Correct answer: A — Begumpet Airport, Hyderabad; 28–31 January 2026

Wings India 2026 is scheduled for 28–31 January 2026 at Begumpet Airport, Hyderabad.

Q13

Wings India 2026 is organised by the Ministry of Civil Aviation in collaboration with which industry body?

Show answer

Correct answer: B — FICCI

The Ministry of Civil Aviation organises Wings India with FICCI.

PM launches ₹26,000-crore projects in Bikaner; inaugurates 103 redeveloped Amrit Bharat stations
Q14

How many redeveloped Amrit Bharat stations did the Prime Minister inaugurate from Bikaner on 22 May 2025?

Show answer

Correct answer: B — 103

The PM inaugurated 103 redeveloped Amrit Bharat stations in 86 districts across 18 States and UTs.

Q15 Advanced

The redeveloped Deshnoke railway station in Rajasthan, inaugurated in May 2025, primarily serves pilgrims visiting which temple?

Show answer

Correct answer: D — Karni Mata Temple

Deshnoke station serves pilgrims and tourists visiting the Karni Mata Temple and is inspired by temple architecture.

Q16 Advanced

Consider the following statements about the PM's programme in Bikaner on 22 May 2025: 1. The 103 Amrit Bharat stations inaugurated are spread over 18 States and Union Territories. 2. The PM laid the foundation stone of the Churu–Sadulpur rail line. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct: 103 stations in 86 districts across 18 States/UTs; foundation stone of the 58-km Churu–Sadulpur line.

Bengaluru, Delhi, Hyderabad, Ahmedabad and Surat to get electric buses under PM E-DRIVE
Q17

Which city is to receive the largest number of electric buses (about 4,500) in the current phase of PM E-DRIVE, as announced in May 2025?

Show answer

Correct answer: C — Bengaluru

About 4,500 e-buses are to go to Bengaluru, 2,800 to Delhi, 2,000 to Hyderabad, 1,000 to Ahmedabad and 600 to Surat.

Q18 Advanced

As approved by the Union Cabinet, how much of the PM E-DRIVE outlay is earmarked for the procurement of e-buses, and how many e-buses does it support?

Show answer

Correct answer: B — ₹4,391 crore for 14,028 e-buses

The Cabinet release provides ₹4,391 crore for 14,028 e-buses; ₹10,900 crore is the total scheme outlay over two years.

Q19 Advanced

Under PM E-DRIVE, which agency handles demand aggregation of e-buses in the nine cities with population above 40 lakh?

Show answer

Correct answer: D — Convergence Energy Services Limited (CESL)

As per the Cabinet release, demand aggregation is done by CESL in nine cities with more than 40 lakh population.

NHAI debars concessionaire after embankment and RE wall failure on NH-66 in Kerala
Q20 Advanced

The embankment settlement and RE wall failure reported on 19 May 2025, after which NHAI debarred the concessionaire, occurred on which section of NH-66 in Kerala?

Show answer

Correct answer: A — Ramanattukara–Valanchery

The incident occurred on the Ramanattukara–Valanchery section of NH-66.

Q21 Advanced

Consider the following statements about NHAI's action over the NH-66 incident in Kerala (May 2025): 1. The concessionaire, KNR Constructions Ltd, was disallowed from ongoing and future bidding. 2. The project consultant was let off with a warning. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Statement 1 is correct. Statement 2 is wrong: the consultant, Highway Engineering Consultant, was also disallowed from bidding and its team leader was suspended.

Sonowal reviews inland waterway projects in Assam and Northeast; ₹1,000 crore more by 2026
Q22 Advanced

In May 2025, Union Minister Sarbananda Sonowal said inland waterway projects worth how much are on the anvil in Assam and the Northeast, targeted for completion by 2026?

Show answer

Correct answer: C — ₹1,000 crore

Projects worth ₹1,000 crore are on the anvil for completion by 2026; of the ₹1,000 crore+ invested in the last two years, ₹300 crore of works are complete and ₹700 crore are ongoing.

MoS Harsh Malhotra inspects 210-km Delhi–Saharanpur–Dehradun Expressway
Q23

The Delhi–Saharanpur–Dehradun Expressway is expected to reduce travel time between Delhi and Dehradun from 6.5 hours to how much?

Show answer

Correct answer: D — 2.5 hours

The expressway will reduce travel time from 6.5 hours to 2.5 hours.

Q24 Advanced

Consider the following statements about the Delhi–Saharanpur–Dehradun Expressway: 1. It includes a 12-km elevated corridor in Rajaji National Park, described as Asia's largest. 2. It has a design speed of 120 km/h. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Only statement 1 is correct. The expressway's designated speed is 100 km/h.

Q25 Advanced

What is the approximate cost at which the Delhi–Saharanpur–Dehradun Expressway is being developed?

Show answer

Correct answer: B — ₹12,000 crore

The expressway is being developed at an approximate cost of ₹12,000 crore.

Karnataka seeks electric buses under PM E-DRIVE; Centre assures phased allocation
Q26 Advanced

As stated by the Ministry of Heavy Industries in May 2025, how many electric buses are to be allocated to 9 major cities under PM E-DRIVE?

Show answer

Correct answer: B — 14,000

14,000 electric buses are to be allocated to 9 major cities under PM E-DRIVE.

Q27 Advanced

Consider the following statements about Karnataka's request for electric buses (May 2025): 1. The request was submitted by Karnataka Transport Minister Ramalinga Reddy. 2. Union Minister H.D. Kumaraswamy said Karnataka would receive buses in a phased and prioritised manner. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Ministry of Heavy Industries release of 16 May 2025.

BCAS revokes security clearance of Celebi and its associated companies
Q28

Which body revoked the security clearance of M/s Celebi and its associated companies in May 2025?

Show answer

Correct answer: C — Bureau of Civil Aviation Security

The Bureau of Civil Aviation Security (BCAS) revoked the clearance on grounds related to national security.

Q29 Advanced

Consider the following statements about the revocation of Celebi's security clearance (May 2025): 1. It was revoked on grounds related to national security. 2. It was revoked by the Directorate General of Civil Aviation. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Only statement 1 is correct. The clearance was revoked by the Bureau of Civil Aviation Security (BCAS).

New ATC tower, technical block and fire station opened at Kolhapur Airport; Kolhapur–Nagpur flight flagged off
Q30

On 15 May 2025, a new ATC Tower cum Technical Block cum Fire Station was inaugurated at which airport in Maharashtra?

Show answer

Correct answer: B — Kolhapur

MoS Murlidhar Mohol inaugurated the facility at Kolhapur Airport.

Q31

The inaugural Star Air flight flagged off from Kolhapur on 15 May 2025 connects Kolhapur with:

Show answer

Correct answer: D — Nagpur

The inaugural Star Air flight was between Kolhapur and Nagpur.

IWAI opens office in Srinagar; to develop three national waterways in Jammu and Kashmir
Q32

In May 2025, the Inland Waterways Authority of India set up a new office in which city?

Show answer

Correct answer: D — Srinagar

IWAI set up its new office at Transport Bhawan, Srinagar.

Q33 Advanced

National Waterway-49 in Jammu and Kashmir, covered by the IWAI–J&K MoU, is on which river?

Show answer

Correct answer: C — Jhelum

NW-49 is on the Jhelum; NW-26 is on the Chenab and NW-84 on the Ravi.

Q34 Advanced

Consider the following statements about IWAI's plans in Jammu and Kashmir (May 2025): 1. Floating jetties are to be set up at five locations. 2. The IWAI–J&K MoU covers three national waterways. Which of the statements given above is/are correct?

Show answer

Correct answer: B — 2 only

Only statement 2 is correct. Floating jetties are planned at ten locations.

India's Major Ports handle about 855 million tonnes of cargo in FY 2024-25
Q35

India's Major Ports handled approximately how much cargo in FY 2024-25?

Show answer

Correct answer: B — 855 million tonnes

Major Ports handled about 855 million tonnes in FY 2024-25, up 4.3% from 819 million tonnes in FY 2023-24.

Q36 Advanced

Which commodity group had the largest share of cargo handled at India's Major Ports in FY 2024-25?

Show answer

Correct answer: A — Petroleum, oil and lubricants (POL)

POL led with 254.5 million tonnes (29.8%), followed by containers (193.5 MT) and coal (186.6 MT).

Bihar launches Rural Roads Strengthening and Management Programme for 6,938 roads
Q37 Advanced

How many rural roads are covered in the first phase of Bihar's Rural Roads Strengthening and Management Programme launched on 12 May 2025?

Show answer

Correct answer: D — 6,938

The first phase covers 6,938 rural roads (12,105 km) at ₹8,716 crore; 14,087 roads are covered in the total approval.

Q38 Advanced

Consider the following statements about Bihar's Rural Roads Strengthening and Management Programme: 1. It is implemented by the Rural Works Department. 2. Administrative approval of ₹21,733 crore has been given for strengthening 14,087 rural roads. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per PTI and the Times of India.

Q39 Advanced

The total length of rural roads covered in the first phase of Bihar's RRSMP is:

Show answer

Correct answer: B — 12,105 km

The first phase covers 12,105 km across 6,938 roads; 24,482 km is the length under the total approval.

Manohar Lal reviews Goa's urban schemes; to consider 24x7 Drink from Tap request
Q40 Advanced

Goa sought special assistance for a 24x7 'Drink from Tap' water supply project under which scheme during the review on 12 May 2025?

Show answer

Correct answer: D — AMRUT 2.0

The Chief Minister sought special assistance for the 24x7 Drink from Tap project under AMRUT 2.0.

Q41 Advanced

The approximate project cost of Goa's proposed 24x7 Drink from Tap (DfT) water supply project was:

Show answer

Correct answer: B — ₹652.61 crore

The project cost is about ₹652.61 crore; ₹326.30 crore was the minimum special financial assistance sought.

Manohar Lal reviews Goa's power sector; AT&C losses at 9.32%
Q42 Advanced

As noted by the Union Power Minister on 12 May 2025, Goa's AT&C (Aggregate Technical & Commercial) losses stood at:

Show answer

Correct answer: A — 9.32%

Goa reduced its AT&C losses to 9.32%, significantly below the national average.

Q43 Advanced

Consider the following statements about the Goa power sector review (12 May 2025): 1. Around 80% of Goa's electricity is procured from outside the state. 2. The Union Minister suggested Goa explore a nuclear power facility as a long-term measure. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Ministry of Power release.

Temporary closure of 32 airports for civil flights lifted
Q44

On 12 May 2025, the Ministry of Civil Aviation lifted the temporary closure for civil aircraft operations at how many airports?

Show answer

Correct answer: D — 32

The temporary closure of 32 airports, earlier in force till 05:29 hrs of 15 May 2025, was lifted with immediate effect.

AAI NOTAMs: civil flights suspended at 32 airports; 25 ATS route segments closed till 15 May
Q45

As per the release of 10 May 2025, how many airports were temporarily closed to civil flight operations under the NOTAMs?

Show answer

Correct answer: A — 32

32 airports across northern and western India were closed for civil flights from 9 to 14 May 2025; 25 was the number of ATS route segments.

Q46 Advanced

Consider the following statements: 1. AAI extended the temporary closure of 25 ATS route segments within the Delhi and Mumbai Flight Information Regions. 2. The route segments were to remain unavailable until 2359 UTC on 14 May 2025, which corresponds to 0529 IST on 15 May 2025. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Ministry of Civil Aviation release.

Q47 Advanced

NOTAM G0555/25 on the closure of ATS route segments replaced which earlier NOTAM?

Show answer

Correct answer: D — G0525/25

As per NOTAM G0555/25 (which replaces G0525/25), the 25 route segments remained unavailable until 2359 UTC on 14 May 2025.

Guwahati gets first household piped natural gas connections; Barak Valley's first CNG station opens in Silchar
Q48

How many households were covered in the first phase of piped natural gas supply in Guwahati inaugurated on 10 May 2025?

Show answer

Correct answer: D — 101

The first phase covered 101 households in the Geetanagar locality; 23 is the approximate number of CNG stations in Assam.

Q49 Advanced

Consider the following statements: 1. Purba Bharati Gas Pvt Ltd is a joint venture of Assam Gas Company Ltd, Oil India Ltd and GAIL Gas Ltd. 2. Barak Valley's first CNG station was inaugurated at Silchar. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct.

Q50

About how many CNG stations were operational in Assam at the time of the 10 May 2025 launch?

Show answer

Correct answer: A — 23

The Chief Minister said Assam has about 23 CNG stations and more need to be set up.

Q51 Advanced

Preliminary work for piped gas was launched on 10 May 2025 in which areas adjoining Guwahati?

Show answer

Correct answer: B — Hajo, Sualkuchi, Rangia and Baihata Chariali

Preliminary work was launched in Hajo, Sualkuchi, Rangia and Baihata Chariali, areas adjoining Guwahati in Kamrup district.

Coal Ministry signs CGPDPA with Category II applicants under Coal Gasification Financial Incentive Scheme
Q52

What is the total outlay of the Financial Incentive Scheme for Coal Gasification launched in January 2024?

Show answer

Correct answer: A — ₹8,500 crore

The scheme, launched on 24 January 2024, has a total outlay of ₹8,500 crore.

Q53 Advanced

Consider the following statements about the Coal Gasification Financial Incentive Scheme: 1. It aims to achieve 100 million tonnes of coal gasification by 2030. 2. It was launched on 24 January 2023. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Only 1 is correct. The scheme was launched on 24 January 2024.

Kerala cabinet clears ₹3,716.10-crore revised estimate for Kochi canals project (IURWTS)
Q54

Which agency will continue as the special purpose vehicle for the Integrated Urban Regeneration and Water Transport System (IURWTS) in Kochi?

Show answer

Correct answer: D — Kochi Metro Rail Limited

KMRL continues as the SPV; the Kerala Water Authority implements the sewerage components, and KIIFB and the NRCD provide funding.

Q55

What revised estimate did the Kerala cabinet approve on 7 May 2025 for the Kochi canals project (IURWTS)?

Show answer

Correct answer: A — ₹3,716.10 crore

The cabinet approved ₹3,716.10 crore. ₹1,325 crore was the 2018 estimate and ₹1,528 crore the February 2021 revision.

CCEA approves Revised SHAKTI policy: coal linkages to power plants through two windows
Q56

Under the Revised SHAKTI policy approved on 7 May 2025, the existing eight paras for coal allocation have been mapped into how many windows?

Show answer

Correct answer: C — Two

The eight paras were mapped to two windows: Window-I (notified price) and Window-II (premium above notified price).

Q57 Advanced

Consider the following statements about Window-II of the Revised SHAKTI policy: 1. Power producers can secure coal for a period of more than 12 months up to 25 years by paying a premium above the notified price. 2. A power purchase agreement is mandatory for selling electricity generated from Window-II coal. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Only 1 is correct. The requirement of a PPA has been done away with for electricity generated from Window-II coal.

Q58

In which year was the original SHAKTI policy for coal allocation introduced?

Show answer

Correct answer: D — 2017

The Ministry of Coal noted that SHAKTI was introduced in 2017, shifting coal allocation from nomination to auction/tariff-based bidding.

IWAI signs MoU with Rhenus Logistics to deploy 100 barges on national waterways
Q59

Under the IWAI–Rhenus Logistics MoU of 6 May 2025, how many barges/cargo vessels are to be deployed in a phased manner on national waterways?

Show answer

Correct answer: B — 100

100 barges are to be deployed in phases; about 20 barges and 6 pushers in the first phase. 70 is the number of countries Rhenus operates in.

Q60 Advanced

Consider the following statements about the IWAI–Rhenus Logistics MoU: 1. Rhenus Logistics is a Germany-based logistics provider. 2. The first phase covers NW-1, NW-2 and NW-16. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct, as per the Ministry of Ports, Shipping and Waterways releases.

Q61

What annual cargo movement does the first phase of the IWAI–Rhenus MoU target by the end of 2025?

Show answer

Correct answer: A — More than one million tonnes

The first phase targets movement of more than one million tonnes of cargo annually by the end of 2025.

In-principle approval for greenfield airports at Kota and Puri
Q62

On 5 May 2025, in-principle approval was granted for greenfield airports at Kota (Rajasthan) and:

Show answer

Correct answer: B — Puri

The approval was for greenfield airports at Kota in Rajasthan and Puri in Odisha.

Q63 Advanced

Consider the following statements about the greenfield airports approved on 5 May 2025: 1. Puri, one of the two sites, is in Andhra Pradesh. 2. The Kota airport is expected to serve the Hadoti region. Which of the statements given above is/are correct?

Show answer

Correct answer: B — 2 only

Only 2 is correct. Puri is in Odisha.

ANRF selects seven e-Nodes under MAHA-EV mission
Q64

How many e-Nodes were selected in May 2025 under ANRF's MAHA-EV mission?

Show answer

Correct answer: D — Seven

Seven e-Nodes were selected out of 227 proposals.

Q65 Advanced

Consider the following statements about the MAHA-EV mission: 1. Its call for proposals focused on three technological verticals, including EV Charging Infrastructure. 2. Selected e-Nodes will work in consortia mode with mandatory industry participation. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct, as per the ANRF announcement of 5 May 2025.

JNCASR develops metal-free organic catalyst that makes hydrogen from mechanical energy
Q66 Advanced

Consider the following statements about the hydrogen catalyst reported by JNCASR in May 2025: 1. It was developed by a team led by Prof. Tapas K. Maji. 2. It is a platinum-based catalyst. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

Only 1 is correct. The catalyst is a metal-free covalent organic framework (COF).

Q67

The Jawaharlal Nehru Centre for Advanced Scientific Research (JNCASR) is located in:

Show answer

Correct answer: A — Bengaluru

JNCASR is in Bengaluru and is an autonomous institution under the Department of Science & Technology.

MoS Satish Chandra Dubey reviews CMPDI's performance in Ranchi
Q68

Where did MoS Satish Chandra Dubey review the performance of CMPDI on 4 May 2025?

Show answer

Correct answer: A — Ranchi

The review meeting was held at Ranchi.