Uttarakhand cabinet approves Green Hydrogen Policy, 2026
Q1 Advanced

Consider the following statements about the Uttarakhand Green Hydrogen Policy, 2026: 1. It was approved by the state cabinet chaired by CM Pushkar Singh Dhami on 28 January 2026. 2. It seeks to use the state's hydropower resources for green hydrogen production. 3. It is aligned with the National Green Hydrogen Mission, 2023. Which of the statements given above are correct?

Show answer

Correct answer: D — 1, 2 and 3

HT and NIE: cabinet chaired by CM Dhami approved it on Wednesday (28 Jan 2026) to leverage hydropower; NIE and TOI: aligned with the National Green Hydrogen Mission, 2023.

India and Canada relaunch Ministerial Energy Dialogue at India Energy Week 2026
Q2 Advanced

At India Energy Week 2026 in Goa, India and Canada launched which renewed mechanism?

Show answer

Correct answer: B — India–Canada Ministerial Energy Dialogue

PIB (Petroleum): the two Ministers launched the renewed India-Canada Ministerial Energy Dialogue.

Q3 Advanced

Consider the following statements about the India–Canada energy meeting at IEW 2026: 1. Canada was represented by Energy Minister Timothy Hodgson. 2. It was the first high-level participation of a Canadian Cabinet Minister at IEW. 3. It followed up on the Prime Ministers' interaction at the G20 Summit in Johannesburg. Which of the statements given above are correct?

Show answer

Correct answer: A — 1 and 2 only

PIB (Petroleum): Hodgson attended, marking the first high-level participation of a Canadian Cabinet Minister at IEW; it followed the PMs' interaction at the G7 Summit in Kananaskis (June 2025), not the G20.

Maharashtra approves Metro Line 8 linking Mumbai and Navi Mumbai airports, and Nashik City Ring Road
Q4 Advanced

Mumbai Metro Line 8, approved by the Maharashtra government on 27 January 2026, will connect:

Show answer

Correct answer: B — Chhatrapati Shivaji Maharaj International Airport and Navi Mumbai International Airport

Deccan Chronicle: the Cabinet Committee on Infrastructure approved Metro Line 8 connecting the Mumbai and Navi Mumbai airports.

Q5 Advanced

The Nashik City Ring Road approved by Maharashtra in January 2026 has a length of about 66 km. In view of which upcoming event was it planned?

Show answer

Correct answer: B — Kumbh Mela

Deccan Chronicle and Free Press Journal: the 66.15-km, ₹3,954-crore ring road was approved in view of the upcoming Kumbh Mela.

₹199.24 crore Smart and Integrated Fishing Harbour approved at Mayabunder, Andaman & Nicobar
Q6 Advanced

The Smart and Integrated Fishing Harbour approved in January 2026 at Mayabunder is located in which State/UT, and under which scheme?

Show answer

Correct answer: D — Andaman & Nicobar Islands; PMMSY

PIB (Fisheries): Mayabunder, Andaman & Nicobar Islands, with 100% central assistance under the Pradhan Mantri Matsya Sampada Yojana.

Q7 Advanced

The Mayabunder fishing harbour will provide safe landing and berthing facilities for how many fishing vessels?

Show answer

Correct answer: C — 430

PIB (Fisheries): safe landing and berthing for 430 fishing vessels and annual fish landing of 9,900 tonnes.

SIAT 2026 automotive technology symposium opens in Pune in ARAI's Diamond Jubilee year
Q8 Advanced

SIAT 2026, inaugurated in Pune on 27 January 2026, is organised by which body during its Diamond Jubilee year?

Show answer

Correct answer: B — Automotive Research Association of India

PIB (Heavy Industries): SIAT 2026 is organised by ARAI with SAE International and SAEINDIA during ARAI's Diamond Jubilee Year.

Scindia lays foundation of ₹450 crore Matabari Tourism Circuit at Dumbur, Tripura
Q9 Advanced

The Matabari Tourism Circuit, whose foundation stone was laid in January 2026, will integrate which of the following?

Show answer

Correct answer: A — Tripura Sundari Temple, Chabimura and Dumbur Lake

PIB (DoNER): the ₹450 crore circuit will integrate the Tripura Sundari Temple, Chabimura and Dumbur Lake.

Q10 Advanced

What is the Ministry of DoNER's contribution to the ₹450 crore Matabari Tourism Circuit?

Show answer

Correct answer: C — ₹276 crore

PIB (DoNER): of the ₹450 crore outlay, ₹276 crore is being contributed by the Ministry of Development of North Eastern Region.

CSIR-CRRI and JSW Steel Salem sign MoA for first steel slag roads in Tamil Nadu
Q11 Advanced

CSIR-CRRI signed an MoA with which steel plant in January 2026 for the first Steel Slag Road implementation in Tamil Nadu?

Show answer

Correct answer: D — JSW Steel, Salem Works

PIB (S&T): CSIR-CRRI and JSW Steel Limited, Salem Works, entered into the partnership on 24 January 2026.

Q12

The 'Steel Slag Road' technology mentioned in the January 2026 CSIR–JSW agreement was developed by:

Show answer

Correct answer: A — CSIR-Central Road Research Institute

PIB: the DG, CSIR highlighted CSIR-CRRI's Steel Slag Road technology, already implemented in several states under CSIR-CRRI's guidance.

Q13 Advanced

Consider the following about the CSIR-CRRI–JSW Steel project of January 2026: 1. It covers EOF and LRF steel slag. 2. The processed slag is meant for bituminous road construction. 3. A demonstration road section will be built near Chennai. Which of the statements given above are correct?

Show answer

Correct answer: B — 1 and 2 only

PIB: the project converts EOF and LRF steel slag into aggregates for bituminous roads; the demonstration road section will be near Salem, not Chennai.

First full rake of rice — 42 wagons, 2,768 tonnes — reaches Anantnag by rail
Q14 Advanced

The first full rake of rice to reach the Kashmir Valley by rail in January 2026 was unloaded at which goods shed?

Show answer

Correct answer: C — Anantnag

PIB (Railways): the first full rake of 42 wagons carrying 2,768 tonnes of rice reached the Anantnag goods shed on 22 January 2026.

Q15 Advanced

From which rail terminal was the first full rake of rice for the Kashmir Valley loaded in January 2026?

Show answer

Correct answer: A — Sangrur, Punjab

PIB (Railways): the full rake was loaded at the Sangrur rail terminal in Punjab on 21 January and reached Anantnag within 24 hours.

Vizhinjam port expansion: work on Phases II–IV begins, longest container berth in India planned
Q16 Advanced

Under the Vizhinjam port capacity augmentation, the container berth will be extended to a continuous length of about:

Show answer

Correct answer: C — 2 km

PIB (Shipping): the existing berth will become a continuous 2-km container berth, the longest in India; the breakwater will be extended to 3.88 km.

Q17

Vizhinjam International Seaport, whose Phase II–IV works began in January 2026, is located in which state?

Show answer

Correct answer: C — Kerala

PIB: the port is at Thiruvananthapuram, Kerala.

Q18 Advanced

Consider the following about Vizhinjam International Seaport: 1. Phase I began commercial operations on 3 December 2024. 2. Phase I has a design capacity of 1 million TEUs. 3. Completion of the expansion is targeted by December 2030. Which of the statements given above are correct?

Show answer

Correct answer: B — 1 and 2 only

PIB: Phase I started on 3 December 2024 with a design capacity of 1 million TEUs; the expansion's completion is targeted by December 2028, not 2030.

PM launches PM SVANidhi Credit Card, flags off three Amrit Bharat Express trains in Thiruvananthapuram
Q19

The PM SVANidhi Credit Card, launched in January 2026, is meant for:

Show answer

Correct answer: A — Street vendors

PIB (PMO): the PM SVANidhi Credit Card, a UPI-linked interest-free revolving credit facility, was launched for street vendors.

Q20 Advanced

Which of the following was NOT among the Amrit Bharat Express trains flagged off from Thiruvananthapuram on 23 January 2026?

Show answer

Correct answer: D — Thrissur–Guruvayur

PIB (PMO): the three Amrit Bharat Express trains were Nagercoil–Mangaluru, Thiruvananthapuram–Tambaram and Thiruvananthapuram–Charlapalli; Thrissur–Guruvayur is a passenger train.

Q21 Advanced

The CSIR innovation hub whose foundation stone was laid in Thiruvananthapuram in January 2026 belongs to which laboratory?

Show answer

Correct answer: A — CSIR-NIIST

PIB (PMO): the PM laid the foundation stone of the CSIR-NIIST Innovation, Technology and Entrepreneurship Hub in Thiruvananthapuram.

NMDC enters coal mining with Tokisud North mine in Jharkhand
Q22 Advanced

NMDC formally entered coal mining in January 2026 with which mine?

Show answer

Correct answer: A — Tokisud North, Hazaribagh

PIB (Steel): NMDC commenced coal mining operations at the Tokisud North Coal Mine in Hazaribagh district, Jharkhand, on 23 January 2026.

Q23

The Tokisud North Coal Mine, where NMDC began operations in January 2026, is in which state?

Show answer

Correct answer: C — Jharkhand

PIB (Steel): the mine is in Hazaribagh district, Jharkhand.

IWDC 3.0 in Kochi identifies inland waterway projects worth over ₹1,500 crore
Q24

The third meeting of the Inland Waterways Development Council (IWDC 3.0) was held in January 2026 at:

Show answer

Correct answer: C — Kochi

PIB (Shipping): IWDC 3.0 concluded in Kochi, Kerala, on 23 January 2026.

Q25 Advanced

Among the new projects presented at IWDC 3.0, how many jetties are planned in the North-East?

Show answer

Correct answer: C — 85

PIB (Shipping): the projects include 110 jetties — 25 in Odisha and 85 in the North-East.

30 GHz frequency allocated for vehicle-to-vehicle communication to cut road accidents
Q26 Advanced

According to Nitin Gadkari (January 2026), which radio frequency has DoT allocated for developing vehicle-to-vehicle communication systems?

Show answer

Correct answer: C — 30 GHz

PIB (MoRTH): Gadkari informed the Consultative Committee that 30 GHz radio frequency has been allocated by DoT for vehicle-to-vehicle communication.

India's power transmission network crosses 5 lakh circuit km
Q27 Advanced

The commissioning of which transmission line took India's network past 5 lakh circuit km in January 2026?

Show answer

Correct answer: B — 765 kV Bhadla II–Sikar II line

PIB (Power): the milestone came on 14 January 2026 with the commissioning of the 628 ckm, 765 kV Bhadla II–Sikar II line in Rajasthan.

Q28 Advanced

By what percentage has India's transmission network (220 kV and above) grown since April 2014?

Show answer

Correct answer: C — 71.6%

PIB (Power): since April 2014 the network has grown by 71.6% with the addition of 2.09 lakh ckm.

Q29

India's inter-regional power transfer capacity, as stated by the Power Ministry in January 2026, is:

Show answer

Correct answer: C — 1,20,340 MW

PIB (Power): inter-regional power transfer capacity now stands at 1,20,340 MW, realising 'One Nation – One Grid – One Frequency'.

Over 10,000 km of rural roads sanctioned under PMGSY-IV for six States/UTs
Q30 Advanced

PMGSY-IV aims to provide connectivity to how many unconnected habitations?

Show answer

Correct answer: B — 25,000

PIB (Rural Development): under PMGSY-IV, 25,000 unconnected habitations (as per Census 2011 norms) are to be connected.

Q31 Advanced

Under PMGSY-IV, what is the minimum population size for an unconnected habitation in LWE-affected districts to be eligible?

Show answer

Correct answer: A — 100+

PIB: eligibility is 500+ in plains, 250+ in North-East and hill States/UTs and special category areas, and 100+ in LWE-affected districts.

Trucks-on-Trains on Western DFC cuts Rewari–Palanpur transit to about 12 hours
Q32 Advanced

Between which stations does Indian Railways' Trucks-on-Trains service currently operate on the Western DFC?

Show answer

Correct answer: B — New Rewari and New Palanpur

PIB (Railways): the ToT service operates between New Rewari and New Palanpur on the Western DFC, about 636 km.

Q33

On the New Rewari–New Palanpur route, Trucks-on-Trains cuts transit time from about 30 hours by road to about:

Show answer

Correct answer: B — 12 hours

PIB (Railways): end-to-end transit falls from nearly 30 hours by road to around 12 hours via ToT.

Draft National Electricity Policy 2026 released for consultation
Q34

The Draft National Electricity Policy 2026, once finalised, will replace the National Electricity Policy notified in which year?

Show answer

Correct answer: C — 2005

PIB (Power): the draft will replace the existing NEP, which was notified in February 2005.

Q35 Advanced

What per capita electricity consumption target for 2030 is set in the Draft National Electricity Policy 2026?

Show answer

Correct answer: B — 2,000 kWh

PIB (Power): the draft targets 2,000 kWh per capita by 2030 and over 4,000 kWh by 2047; consumption was 1,460 kWh in 2024-25.

Q36 Advanced

Consider the following milestones cited in the Draft National Electricity Policy 2026: 1. A unified national grid became operational in December 2013. 2. Universal electrification was achieved by March 2021. 3. Per capita consumption crossed 2,000 kWh in 2024-25. Which of the statements given above are correct?

Show answer

Correct answer: B — 1 and 2 only

PIB (Power): the national grid became unified in December 2013 and universal electrification came by March 2021; per capita consumption in 2024-25 was 1,460 kWh, so statement 3 is wrong.

Lucknow becomes UP's first 'zero fresh waste dump' city
Q37

Which city became the first in Uttar Pradesh to achieve 100% scientific processing of municipal solid waste, as announced in January 2026?

Show answer

Correct answer: A — Lucknow

PIB (MoHUA): Lucknow became UP's first 'zero fresh waste dump' city.

Q38 Advanced

What is the processing capacity of Lucknow's newly commissioned Shivari Solid Waste Management Plant?

Show answer

Correct answer: C — 700 TPD

PIB (MoHUA): the Shivari plant can process 700 metric tonnes per day.

DGCA launches Electronic Personnel Licence for Airline Transport Pilot Licence
Q39

Through which mobile application can DGCA's Electronic Personnel Licence be accessed?

Show answer

Correct answer: B — eGCA

PIB (Civil Aviation): the EPL can be accessed through the eGCA mobile application.

Q40 Advanced

With which licences did DGCA begin rolling out the Electronic Personnel Licence in February 2025?

Show answer

Correct answer: B — CPL and FRTOL

PIB (Civil Aviation): the EPL roll-out began in February 2025 with the Commercial Pilot's Licence and the Flight Radio Telephone Operator's (Restricted) Licence; ATPL was added on 21 January 2026.

Motor vehicle rules amended: no NOC, fitness or permit with unpaid toll
Q41 Advanced

The Central Motor Vehicles (Second Amendment) Rules, 2026 amend which set of rules?

Show answer

Correct answer: A — Central Motor Vehicles Rules, 1989

PIB (MoRTH): the Second Amendment Rules, 2026 introduce changes to the Central Motor Vehicles Rules, 1989.

Q42 Advanced

Under the January 2026 amendment to the motor vehicle rules, which of the following is NOT stated to be withheld for a vehicle with unpaid National Highway user fee?

Show answer

Correct answer: D — Renewal of the owner's driving licence

PIB (MoRTH): the rules bar the transfer NOC, fitness certificate renewal/generation and National Permit while user fee is unpaid; driving licence renewal is not mentioned.

Q43 Advanced

Under the amended rules, an 'unpaid user fee' refers to a fee for a National Highway section where:

Show answer

Correct answer: B — The ETC system recorded the vehicle's passage but the fee was not received

PIB (MoRTH): 'unpaid user fee' is the fee for an NH section where the ETC system recorded the vehicle's passage but the fee was not received in accordance with the National Highways Act, 1956.

TDB signs pact for commercial production of steel-slag pothole mix ECOFIX
Q44 Advanced

ECOFIX, for which the Technology Development Board signed a commercialisation pact in January 2026, is:

Show answer

Correct answer: B — A ready-to-use pothole repair mix made from steel slag

PIB (Science & Technology): ECOFIX is a ready-to-use pothole repair mix capable of turning steel slag into a durable, instant repair option.

Q45

The industry partner that signed the ECOFIX agreement with the Technology Development Board is based in which city?

Show answer

Correct answer: B — Visakhapatnam

PIB (Science & Technology): the agreement was with Visakhapatnam-based Ramuka Global Eco Work Private Limited.

Centre of Excellence for power sector regulation launched at IIT Delhi
Q46 Advanced

The Centre of Excellence for Regulatory Affairs in the Power Sector, launched in January 2026, was set up at which institution?

Show answer

Correct answer: A — IIT Delhi

PIB (Power): Power Minister Manohar Lal inaugurated the Centre at IIT Delhi.

Q47 Advanced

Which of the following jointly established the Centre of Excellence for Regulatory Affairs in the Power Sector?

Show answer

Correct answer: A — IIT Delhi, CERC and Grid India

PIB (Power): the Centre is jointly established by IIT Delhi, the Central Electricity Regulatory Commission and Grid Controller of India Ltd.

Overhead electrification masts going up on Mumbai–Ahmedabad bullet train corridor
Q48 Advanced

What overhead traction power system will the OHE masts on the Mumbai–Ahmedabad bullet train corridor support?

Show answer

Correct answer: B — 2×25 kV

PIB (Railways): the masts will support the complete 2×25 kV overhead traction power system.

Q49

Roughly how many OHE masts will be installed along the Mumbai–Ahmedabad bullet train corridor?

Show answer

Correct answer: C — More than 20,000

PIB (Railways): in total, more than 20,000 masts ranging from 9.5 to 14.5 metres will be installed.

Railways run 244 special trains for Mauni Amavasya, 40 in Prayagraj on peak day
Q50

How many special trains did Indian Railways run for the Mauni Amavasya period from 3 January 2026?

Show answer

Correct answer: C — 244

PIB (Railways): 244 special trains were operated since 3 January 2026, serving about 4.5 lakh passengers.

Q51 Advanced

Which railway zone ran the largest number of the 244 Mauni Amavasya special trains in January 2026?

Show answer

Correct answer: D — North Central Railway

PIB (Railways): North Central Railway ran 158 trains, Northern Railway 31 and North Eastern Railway 55.

PM lays foundation of ₹6,950 crore Kaziranga Elevated Corridor in Assam
Q52

The Kaziranga Elevated Corridor Project, whose Bhoomi Pujan was performed in January 2026, involves 4-laning of a section of which National Highway?

Show answer

Correct answer: A — NH-715

PIB (PMO): the project is the 4-laning of the Kaliabor–Numaligarh section of NH-715.

Q53 Advanced

What is the approximate cost of the Kaziranga Elevated Corridor Project?

Show answer

Correct answer: A — Over ₹6,950 crore

PIB (PMO): the project is worth over ₹6,950 crore.

Q54 Advanced

At the Kaziranga corridor event, the PM recalled that which warrior strategised from Kaliabor to drive out the Mughal army?

Show answer

Correct answer: A — Lachit Borphukan

PIB (Ports, Shipping and Waterways): the PM recalled that it was from Kaliabor that Lachit Borphukan strategised to drive out the Mughal invaders.

PM launches ₹830 crore projects in Singur, including hybrid electric catamarans and Amrit Bharat trains
Q55

In which district of West Bengal is Singur, where the PM launched projects worth over ₹830 crore on 18 January 2026?

Show answer

Correct answer: D — Hooghly

PIB (PMO): the projects were launched at Singur in Hooghly district, West Bengal.

Q56 Advanced

How many hybrid electric catamarans did the PM launch for passenger transport on Kolkata's waterways in January 2026?

Show answer

Correct answer: C — Six

PIB (Ports, Shipping and Waterways): PM Modi launched six hybrid electric catamarans to boost green passenger transport on Kolkata waterways.

Q57 Advanced

At Singur, the PM said an Extended Port Gate System being built at which place would open new opportunities for Hooghly?

Show answer

Correct answer: A — Balagarh

PIB (PMO): the PM said the Extended Port Gate System being built in Balagarh will open new opportunities for Hooghly and surrounding areas.

Power distribution utilities post ₹2,701 crore profit in FY 2024-25 after years of losses
Q58 Advanced

What combined Profit After Tax did India's power distribution utilities record in FY 2024-25?

Show answer

Correct answer: D — Profit of ₹2,701 crore

PIB (Power): distribution utilities recorded a positive PAT of ₹2,701 crore in FY 2024-25.

Q59 Advanced

What was the combined loss of India's power distribution utilities in FY 2013-14, as cited by the Power Ministry in January 2026?

Show answer

Correct answer: D — ₹67,962 crore

PIB (Power): the utilities lost ₹67,962 crore in FY 2013-14 and ₹25,553 crore in FY 2023-24.

Q60 Advanced

Consider the following statements about power distribution utilities' finances as reported in January 2026: 1. They returned a positive PAT in FY 2024-25 after several years of losses. 2. Their loss in FY 2023-24 was ₹25,553 crore. 3. The Revamped Distribution Sector Scheme was cited as one of the reforms behind the turnaround. Which of the statements given above are correct?

Show answer

Correct answer: D — 1, 2 and 3

PIB (Power): PAT turned positive at ₹2,701 crore in FY 2024-25 after years of losses, the FY 2023-24 loss was ₹25,553 crore, and RDSS is listed among the transformative initiatives.

High-speed-capable rail track grows to 84,244 km from 31,445 km in 2014
Q61 Advanced

According to Indian Railways in January 2026, the length of track capable of 110 km/h or more has grown from 31,445 km in 2014 to:

Show answer

Correct answer: C — 84,244 km

PIB (Railways): high-speed-capable track length grew from 31,445 km in 2014 to 84,244 km, about 80% of the network.

Q62

How many track kilometres of track renewal did Indian Railways complete in 2024-25?

Show answer

Correct answer: B — 6,851

PIB (Railways): track renewal was carried out over 6,851 track km in 2024-25; 7,900 track km is planned for 2026-27.

DGCA imposes ₹22.20 crore penalty on IndiGo over December 2025 flight disruptions
Q63

What total financial penalty did DGCA impose on IndiGo over its December 2025 flight disruptions?

Show answer

Correct answer: A — ₹22.20 crore

PIB (Civil Aviation): ₹1.80 crore in one-time penalties plus ₹20.40 crore for 68 days of continued non-compliance, a total of ₹22.20 crore. The ₹50 crore is a bank guarantee, not a penalty.

Q64 Advanced

Under which scheme must IndiGo furnish a ₹50 crore bank guarantee, released in phases as reforms are verified?

Show answer

Correct answer: A — IndiGo Systemic Reform Assurance Scheme (ISRAS)

PIB (Civil Aviation): the ₹50 crore bank guarantee is under the IndiGo Systemic Reform Assurance Scheme (ISRAS).

Q65 Advanced

How many IndiGo flights were cancelled during the disruptions of 3–5 December 2025?

Show answer

Correct answer: B — 2,507

PIB (Civil Aviation): 2,507 flights were cancelled and 1,852 delayed.

Q66 Advanced

Consider the following statements about DGCA's action on IndiGo (January 2026): 1. DGCA formed a four-member committee to inquire into the disruptions. 2. The penalties were imposed under Rule 133A of the Aircraft Rules, 1937. 3. Over 30 lakh passengers were affected by the disruptions. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 and 2 only

PIB (Civil Aviation): statements 1 and 2 are correct. Statement 3 is wrong: over 3 lakh (not 30 lakh) passengers were affected.

Q67 Advanced

Which IndiGo official is to be relieved of operational duties following DGCA's findings on the December 2025 disruptions?

Show answer

Correct answer: D — The SVP (OCC)

PIB (Civil Aviation): the CEO was cautioned and the COO warned, while the SVP (OCC) is to be relieved of operational duties.

PM flags off India's first Vande Bharat Sleeper train from Malda; ₹3,250 crore projects launched
Q68

India's first Vande Bharat Sleeper train, flagged off on 17 January 2026, runs between which two stations?

Show answer

Correct answer: A — Howrah and Guwahati (Kamakhya)

PIB (PMO): the PM flagged off India's first Vande Bharat Sleeper Train between Howrah and Guwahati (Kamakhya) at Malda Town Railway Station.

Q69

At which railway station did the PM flag off India's first Vande Bharat Sleeper train?

Show answer

Correct answer: D — Malda Town

PIB (PMO): the PM visited Malda Town Railway Station, where he flagged off the train.

Q70 Advanced

What was the total value of the rail and road projects the PM inaugurated and laid foundation stones for at Malda on 17 January 2026?

Show answer

Correct answer: D — ₹3,250 crore

PIB (PMO): the projects at Malda were worth ₹3,250 crore.

Q71 Advanced

Which of the following was NOT among the four Amrit Bharat Express trains flagged off at Malda on 17 January 2026?

Show answer

Correct answer: D — Alipurduar–Chennai

PIB (PMO): the four trains were New Jalpaiguri–Nagercoil, New Jalpaiguri–Tiruchchirappalli, Alipurduar–Bengaluru and Alipurduar–Mumbai. There was no Alipurduar–Chennai train.