Infrastructure & Energy Current Affairs One-liners — All time
Daily news by your exam, state and topic — each with a short summary, key facts and MCQs.
Fri, 29 Aug 2025
Wed, 27 Aug 2025
- The Union Cabinet on 27 August 2025 approved restructuring of the PM SVANidhi scheme for street vendors, extending its lending period to 31 March 2030 with a total outlay of ₹7,332 crore.
- The Union Cabinet on 27 August 2025 approved four railway projects costing about ₹12,328 crore, including a new Kutch line and multi-tracking projects in Karnataka, Telangana, Bihar and Assam.
Tue, 26 Aug 2025
Mon, 25 Aug 2025
- Prime Minister Narendra Modi inaugurated, laid foundation stones for and dedicated development works worth ₹5,400 crore in Ahmedabad, Gujarat, on 25 August 2025.
- The Ministry of Ports, Shipping and Waterways launched MAR-a-THON 2025, India's Maritime Hackathon, at IIT Madras on 25 August 2025 under the Sagarmala Start-up Innovation Initiative.
Sun, 24 Aug 2025
Sat, 23 Aug 2025
Fri, 22 Aug 2025
- Prime Minister Narendra Modi inaugurated and laid the foundation stone of projects worth over ₹5,200 crore in Kolkata on 22 August 2025, including 13.61 km of new metro network and the 7.2 km six-lane elevated Kona Expressway.
- Prime Minister Narendra Modi inaugurated and laid the foundation stone of development projects worth ₹12,000 crore at Gaya, Bihar, on 22 August 2025, including the Aunta–Simaria bridge project on NH-31 and the 660 MW Buxar Thermal Power Plant.
Tue, 19 Aug 2025
- The Cabinet Committee on Economic Affairs on 19 August 2025 approved a 6-lane access-controlled Capital Region Ring Road (Bhubaneswar Bypass, 110.875 km) in Odisha on Hybrid Annuity Mode at a capital cost of ₹8,307.74 crore.
- The Cabinet Committee on Economic Affairs on 19 August 2025 approved the Airports Authority of India's proposal for a greenfield airport at Kota-Bundi, Rajasthan, at an estimated cost of ₹1,507 crore.
Mon, 18 Aug 2025
- The Rajya Sabha passed the Indian Ports Bill, 2025 on 18 August 2025, completing parliamentary approval of the law that replaces the colonial-era Indian Ports Act, 1908.
- The National Highways Authority of India on 18 August 2025 imposed a ₹20 lakh penalty on the toll collection agency at Bhuni Toll Plaza on the Meerut–Karnal section of NH-709A after its staff assaulted an Army personnel.
- Mumbai Port Trust, with the Inland Waterways Authority of India, organised the 'Tourism Avenues – Waterways to Wonder: Unlocking Cruise Tourism' conference in Mumbai on 18 August 2025.
Sun, 17 Aug 2025
Fri, 15 Aug 2025
Wed, 13 Aug 2025
- The Ministry of New and Renewable Energy said on 13 August 2025 that India's solar PV module manufacturing capacity enlisted under the Approved List of Models and Manufacturers (ALMM) has reached 100 GW, up from 2.3 GW in 2014.
- The Network Planning Group evaluated seven infrastructure projects — one road, one multi-modal logistics park, three rail projects and two PM MITRA textile parks — for conformity with PM GatiShakti principles at its 98th meeting, the Commerce Ministry said on 13 August 2025.
Tue, 12 Aug 2025
- The Union Cabinet on 12 August 2025 approved Phase-1B of the Lucknow Metro Rail Project, an 11.165 km corridor with 12 stations, at a cost of ₹5,801 crore.
- The Cabinet Committee on Economic Affairs on 12 August 2025 approved an investment of ₹8,146.21 crore for the 700 MW Tato-II Hydro Electric Project in Shi Yomi district of Arunachal Pradesh, with a completion period of 72 months.
Mon, 11 Aug 2025
- Parliament passed the Merchant Shipping Bill, 2025 on 11 August 2025 when the Rajya Sabha adopted it, after the Lok Sabha had passed it on 6 August.
- Prime Minister Narendra Modi on 11 August 2025 inaugurated 184 newly built Type-VII multi-storey flats for Members of Parliament at Baba Kharak Singh Marg, New Delhi.
Sun, 10 Aug 2025
- Prime Minister Narendra Modi on 10 August 2025 inaugurated the Yellow Line of Bangalore Metro, laid the foundation stone of Metro Phase-3 and flagged off three Vande Bharat Express trains, in projects worth around ₹22,800 crore.
- The foundation stone of the ₹1,800 crore 'Brahma–BEML Rail Manufacturing Hub' was laid on 10 August 2025 at Umaria village of Obedullaganj in the Vidisha Lok Sabha constituency of Madhya Pradesh.
Sat, 09 Aug 2025
Fri, 08 Aug 2025
- The Cabinet Committee on Economic Affairs on 8 August 2025 approved a 46-km, 4-lane Marakkanam–Puducherry section of NH-332A in Tamil Nadu on Hybrid Annuity Mode at a capital cost of ₹2,157 crore.
- The Ministry of Heavy Industries on 8 August 2025 extended the PM E-DRIVE scheme by two years, from 31 March 2026 to 31 March 2028, within the same outlay of ₹10,900 crore; support for e-2Ws, e-rickshaws and e-3Ws still ends on 31 March 2026.