The Kaziranga Elevated Corridor Project, whose Bhoomi Pujan was performed in January 2026, involves 4-laning of a section of which National Highway?
Show answer
Correct answer: A — NH-715
What is the approximate cost of the Kaziranga Elevated Corridor Project?
Show answer
Correct answer: A — Over ₹6,950 crore
At the Kaziranga corridor event, the PM recalled that which warrior strategised from Kaliabor to drive out the Mughal army?
Show answer
Correct answer: A — Lachit Borphukan
To which country did India flag off the first tranche of Guided Pinaka rockets on 18 January 2026?
Show answer
Correct answer: A — Armenia
The Medium Caliber Ammunition Manufacturing Facility inaugurated at Solar Defence & Aerospace Ltd, Nagpur, manufactures which ammunition?
Show answer
Correct answer: B — 30mm
At Nagpur in January 2026, the Defence Minister said the government aims to raise the private sector's share in defence manufacturing to what level soon?
Show answer
Correct answer: C — 50% or more
In which district of West Bengal is Singur, where the PM launched projects worth over ₹830 crore on 18 January 2026?
Show answer
Correct answer: D — Hooghly
How many hybrid electric catamarans did the PM launch for passenger transport on Kolkata's waterways in January 2026?
Show answer
Correct answer: C — Six
At Singur, the PM said an Extended Port Gate System being built at which place would open new opportunities for Hooghly?
Show answer
Correct answer: A — Balagarh
Which vessel was flagged off from Kochi in January 2026 for the fifth edition of the Sagar Maitri initiative?
Show answer
Correct answer: B — INS Sagardhwani
INS Sagardhwani operates under which DRDO laboratory?
Show answer
Correct answer: B — Naval Physical and Oceanographic Laboratory
In the context of the Sagar Maitri programme, MAITRI stands for:
Show answer
Correct answer: B — Marine & Allied Interdisciplinary Training and Research Initiative
Where was India's first open-sea marine fish farming project launched in January 2026?
Show answer
Correct answer: D — North Bay, Sri Vijaya Puram
Which institute brought the open-sea cage technology used in India's first open-sea marine fish farming project?
Show answer
Correct answer: A — NIOT
What combined Profit After Tax did India's power distribution utilities record in FY 2024-25?
Show answer
Correct answer: D — Profit of ₹2,701 crore
What was the combined loss of India's power distribution utilities in FY 2013-14, as cited by the Power Ministry in January 2026?
Show answer
Correct answer: D — ₹67,962 crore
Consider the following statements about power distribution utilities' finances as reported in January 2026: 1. They returned a positive PAT in FY 2024-25 after several years of losses. 2. Their loss in FY 2023-24 was ₹25,553 crore. 3. The Revamped Distribution Sector Scheme was cited as one of the reforms behind the turnaround. Which of the statements given above are correct?
Show answer
Correct answer: D — 1, 2 and 3
Where was PM Vishwakarma Haat 2026 inaugurated in January 2026?
Show answer
Correct answer: B — Dilli Haat, INA, New Delhi
Which ministry organised PM Vishwakarma Haat 2026?
Show answer
Correct answer: C — Ministry of MSME
The first dedicated IndiaSkills regional competition for the North Eastern Region (IndiaSkills 2025-26) was scheduled to be held at:
Show answer
Correct answer: B — Gauhati University
In how many skill categories were youth to compete at the IndiaSkills 2025-26 North East Regional Competition?
Show answer
Correct answer: C — 26
How many patients availed consultations at the Joint Services Multi-Speciality Medical Camp in Lakshadweep in January 2026?
Show answer
Correct answer: C — 4,719
Which of the following islands was NOT among the venues of the Joint Services medical camp in Lakshadweep in January 2026?
Show answer
Correct answer: C — Bangaram
According to Indian Railways in January 2026, the length of track capable of 110 km/h or more has grown from 31,445 km in 2014 to:
Show answer
Correct answer: C — 84,244 km
How many track kilometres of track renewal did Indian Railways complete in 2024-25?
Show answer
Correct answer: B — 6,851