SF Prep Notes

High-speed-capable rail track grows to 84,244 km from 31,445 km in 2014

Indian Railways said on 18 January 2026 that track fit for 110 km/h or more has grown from 31,445 km in 2014 to 84,244 km, covering about 80% of the network, and that 6,851 km of track was renewed in 2024-25.

Summary

Indian Railways reported that track renewal covered 6,851 track km in 2024-25, with more than 7,500 track km underway in 2025-26 and 7,900 track km planned for 2026-27. Track capable of 110 km/h and above has grown from 31,445 km in 2014 to 84,244 km, enabling such speeds across about 80% of the national network. In 2024-25 the Railways also provided 7,161 Thick Web Switches and 1,704 Weldable CMS Crossings and completed 7,442 track km of mechanised ballast deep screening.

Key facts

Track renewal 2024-25
6,851 track km
2025-26 underway
Over 7,500 track km
2026-27 planned
7,900 track km
110 km/h+ track
31,445 km (2014) → 84,244 km
Share of network
About 80%

Practice MCQs 2 questions

Q1 Advanced

According to Indian Railways in January 2026, the length of track capable of 110 km/h or more has grown from 31,445 km in 2014 to:

Show answer

Correct answer: C — 84,244 km

PIB (Railways): high-speed-capable track length grew from 31,445 km in 2014 to 84,244 km, about 80% of the network.

Q2

How many track kilometres of track renewal did Indian Railways complete in 2024-25?

Show answer

Correct answer: B — 6,851

PIB (Railways): track renewal was carried out over 6,851 track km in 2024-25; 7,900 track km is planned for 2026-27.

← All current affairs