Overhead electrification masts going up on Mumbai–Ahmedabad bullet train corridor

The Railways Ministry said on 19 January 2026 that installation of overhead electrification (OHE) masts is progressing on the Mumbai–Ahmedabad bullet train corridor, with more than 20,000 masts planned.

Summary

The Mumbai–Ahmedabad Bullet Train project, India's first high-speed rail system, is installing OHE masts across key sections, including elevated viaducts. More than 20,000 masts, 9.5 to 14.5 metres tall, will support the complete 2×25 kV overhead traction system, including wires, earthing and fittings. A network of traction substations and distribution substations is also being built along the corridor. The ministry presented the work as an example of 'Make in India' in high-speed rail.

Key facts

Project
Mumbai–Ahmedabad Bullet Train (India's first high-speed rail)
Masts planned
More than 20,000
Mast height
9.5 to 14.5 metres
Traction system
2×25 kV overhead
Power supply
Traction and distribution substations along the corridor

Practice MCQs 2 questions

Q1 Advanced

What overhead traction power system will the OHE masts on the Mumbai–Ahmedabad bullet train corridor support?

Show answer

Correct answer: B — 2×25 kV

PIB (Railways): the masts will support the complete 2×25 kV overhead traction power system.

Q2

Roughly how many OHE masts will be installed along the Mumbai–Ahmedabad bullet train corridor?

Show answer

Correct answer: C — More than 20,000

PIB (Railways): in total, more than 20,000 masts ranging from 9.5 to 14.5 metres will be installed.