Kavach 4.0 commissioned on Mathura–Kota section of Delhi–Mumbai route

On 30 July 2025, Indian Railways announced that it had commissioned the indigenous train protection system Kavach 4.0 on the Mathura–Kota section of the high-density Delhi–Mumbai route.

Summary

Indian Railways commissioned the indigenous automatic train protection system Kavach 4.0 on the Mathura–Kota section of the high-density Delhi–Mumbai route, Railway Minister Ashwini Vaishnaw announced on 30 July 2025. Kavach helps loco pilots control train speed through automatic brake application and shows signal information inside the cab, even in fog. Designed to Safety Integrity Level 4 (SIL 4), the highest level, Kavach was developed from 2015, installed first on South Central Railway and given its first operational certificate in 2018. RFID tags are placed every 1 km on the track and at every signal. The Railways plans to commission Kavach 4.0 on routes across the country within six years.

Key facts

Commissioned
Mathura–Kota section, Delhi–Mumbai route (announced 30 July 2025)
System
Indigenous Automatic Train Protection
Safety level
SIL 4 (highest)
History
Development from 2015; first operational certificate 2018 on South Central Railway
RFID tags
Every 1 km and at every signal
Target
Nationwide within 6 years

Practice MCQs 3 questions

Q1

On which section of the Delhi–Mumbai route was Kavach 4.0 commissioned, as announced on 30 July 2025?

Show answer

Correct answer: C — Mathura–Kota

The Railway Ministry said Kavach 4.0 was commissioned on the Mathura–Kota section.

Q2 Advanced

Kavach, India's automatic train protection system, is designed to which Safety Integrity Level?

Show answer

Correct answer: A — SIL 4

The Railway Ministry says Kavach is designed at SIL 4, the highest level of safety design.

Q3 Advanced

Consider the following statements about Kavach: 1. Its first operational certificate was granted in 2018 after installation on South Central Railway. 2. RFID tags for Kavach are installed every 10 km along the track. Which of the statements given above is/are correct?

Show answer

Correct answer: B — 1 only

Statement 1 is correct. Statement 2 is wrong: RFID tags are installed every 1 km and at every signal.