Kavach 4.0 commissioned on 1,452 route km of Delhi–Mumbai and Delhi–Howrah routes

The Railway Ministry said on 11 March 2026 that version 4.0 of Kavach, India's indigenous automatic train protection system, has been commissioned on 1,452 route km covering the high-density Delhi–Mumbai and Delhi–Howrah routes.

Summary

Kavach 4.0, the latest version of Indian Railways' indigenously developed Automatic Train Protection (ATP) system, has been commissioned on 1,452 route km covering the high-density Delhi–Mumbai and Delhi–Howrah routes, Railway Minister Ashwini Vaishnaw said on 11 March 2026. Trackside Kavach work has been taken up on 24,427 route km, covering the entire Golden Quadrilateral, Golden Diagonals and high-density network; so far 8,570 km of optical fibre, 1,100 towers and 767 station data centres have been set up. Kavach applies the brakes automatically if the loco pilot fails to keep within speed limits and is certified to Safety Integrity Level 4 (SIL-4). It was adopted as the National ATP system in July 2020, and the Research Designs and Standards Organisation (RDSO) approved the version 4.0 specification on 16 July 2024. Railway safety spending has risen from ₹39,200 crore in 2013–14 to ₹1,20,389 crore in 2026–27.

Key facts

Announced
11 March 2026, Railway Ministry
Commissioned
Kavach 4.0 on 1,452 route km — Delhi–Mumbai, Delhi–Howrah
Taken up
24,427 route km (GQ, Golden Diagonals, HDN)
Built so far
8,570 km OFC; 1,100 towers; 767 station data centres
Static
National ATP system since July 2020; SIL-4; v4.0 spec approved by RDSO 16 July 2024
Safety spend
₹39,200 cr (2013–14) → ₹1,20,389 cr (2026–27)

Practice MCQs 3 questions

Q1

On how many route km has Kavach 4.0 been commissioned, as per the Railway Ministry on 11 March 2026?

Show answer

Correct answer: A — 1,452 route km

Kavach 4.0 is commissioned on 1,452 route km of the Delhi–Mumbai and Delhi–Howrah routes; 24,427 route km is the length on which work has been taken up.

Q2 Advanced

Kavach 4.0 has been commissioned on sections of which two high-density routes?

Show answer

Correct answer: B — Delhi–Mumbai and Delhi–Howrah

The 1,452 route km cover the high-density Delhi–Mumbai and Delhi–Howrah routes.

Q3 Advanced

Consider the following statements about Kavach: 1. It was adopted as the National Automatic Train Protection system in July 2020. 2. The Kavach version 4.0 specification was approved by the RDSO in July 2024. Which of the above is/are correct?

Show answer

Correct answer: C — Both 1 and 2