SF Prep Notes

NHAI signs concession for 88 km six-lane Agra–Gwalior Greenfield Expressway on BOT (Toll)

NHAI signed a concession agreement with G.R. Infraprojects Ltd on 30 April 2025 to build the 88 km six-lane access-controlled Agra–Gwalior Greenfield Expressway (NH-719D) on BOT (Toll) mode.

Summary

The Agra–Gwalior Greenfield Expressway (NH-719D), an 88 km six-lane access-controlled road, will be built by G.R. Infraprojects Ltd under a concession agreement signed with the National Highways Authority of India on 30 April 2025, on Build-Operate-Transfer (Toll) mode. It will start at Deori village in Agra and end at Susera village in Gwalior, passing through Uttar Pradesh, Rajasthan and Madhya Pradesh. The concession period is 20 years, including 30 months of construction. As the route crosses the National Chambal Sanctuary, a cable-stayed bridge on the Chambal is planned to protect the gharial, along with sound barriers and light cutters.

Key facts

Date
30 April 2025
Road
Agra–Gwalior Greenfield Expressway, NH-719D, 88 km, 6-lane
Mode
BOT (Toll)
Concessionaire
G.R. Infraprojects Ltd
Route
Deori (Agra) to Susera (Gwalior); UP, Rajasthan, MP
Concession
20 years incl. 30 months construction
Wildlife
Cable-stayed bridge on Chambal for gharial

Practice MCQs 2 questions

Q1 Advanced

A cable-stayed bridge on the Chambal is planned on the Agra–Gwalior Greenfield Expressway to protect which species?

Show answer

Correct answer: D — Gharial

As the expressway passes through the National Chambal Sanctuary, a cable-stayed bridge on the Chambal is planned for the conservation of the gharial.

Q2 Advanced

Consider the following statements about the Agra–Gwalior Greenfield Expressway: 1. It is 88 km long and numbered NH-719D. 2. It will pass through Uttar Pradesh, Rajasthan and Madhya Pradesh. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct as per the Ministry of Road Transport and Highways.

← All current affairs