SF Prep Notes

NW-2 par ₹526 crore ke waterway projects: Pandu Port corridor, Bogibeel RCoE, 2 cruise terminals

PM Narendra Modi ne 13 March 2026 ko Brahmaputra (NW-2) par IWAI ke ₹526 crore ke 4 projects shuru kiye, jismein Pandu Port–NH-27 elevated corridor dedicate hua.

Summary

IWAI ke National Waterway-2 (Brahmaputra) par ₹526 crore ke 4 projects PM Modi ne 13 March 2026 ko shuru kiye. ₹180 crore ka Pandu Port–NH-27 elevated corridor dedicate hua. Bogibeel, Dibrugarh mein ₹188 crore ke Regional Centre of Excellence (saal mein 5,000+ trainees) aur Neamati cruise terminal ka bhoomi pujan, Biswanath Ghat terminal ka shilanyas hua; dono terminals ₹158 crore. IWAI ke mutabik 891 km ka Bangladesh border–Sadiya stretch 1 September 1988 ko NW-2 declare hua tha.

Key facts

Total
₹526 crore
Corridor
Pandu Port–NH-27, ₹180 crore
RCoE
Bogibeel, ₹188 crore
NW-2
891 km, 1988

Practice MCQs 3 questions

Q1

13 मार्च 2026 को जिस ₹188 करोड़ के IWAI क्षेत्रीय उत्कृष्टता केंद्र का भूमि पूजन हुआ, वह कहां है?

Answer dekho

Sahi uttar: B — बोगीबील, डिब्रूगढ़

क्षेत्रीय उत्कृष्टता केंद्र डिब्रूगढ़ के बोगीबील में है और हर साल 5,000 से अधिक छात्रों को पोत संचालन और अंतर्देशीय नौवहन का प्रशिक्षण देगा।

Q2 Advanced

13 मार्च 2026 को समर्पित एलिवेटेड रोड कॉरिडोर गुवाहाटी के पांडु बंदरगाह को किस राजमार्ग से जोड़ता है?

Answer dekho

Sahi uttar: C — NH-27

₹180 करोड़ का कॉरिडोर पांडु बंदरगाह परिसर को NH-27 से जोड़ता है और नदी व सड़क के बीच अंतिम छोर की कमी दूर करता है।

Q3 Advanced

राष्ट्रीय जलमार्ग-2 के बारे में निम्नलिखित कथनों पर विचार कीजिए: 1. यह बांग्लादेश सीमा और सदिया के बीच ब्रह्मपुत्र का 891 किमी लंबा हिस्सा है। 2. इसे पहली बार राष्ट्रीय जलमार्ग अधिनियम, 2016 द्वारा राष्ट्रीय जलमार्ग घोषित किया गया। उपरोक्त में से कौन-सा/से सही है/हैं?

Answer dekho

Sahi uttar: A — केवल 1

कथन 1 सही है। कथन 2 गलत है: IWAI के अनुसार NW-2 को 1 सितंबर 1988 को राष्ट्रीय जलमार्ग (ब्रह्मपुत्र नदी का सदिया–धुबरी खंड) अधिनियम, 1988 द्वारा घोषित किया गया था।

← Saari current affairs