SF Prep Notes

Keel of Indian Navy's third Cadet Training Ship (Yard 18005) laid at L&T Kattupalli

The keel laying of the third Cadet Training Ship took place at L&T Shipyard, Kattupalli, Tamil Nadu, on 30 December 2024.

Summary

The keel of the Indian Navy's third Cadet Training Ship, Yard 18005, was laid at L&T Shipyard, Kattupalli, Tamil Nadu, on 30 December 2024. The ceremony was presided over by Rear Admiral Ravi Kumar Dhingra, Flag Officer Tamil Nadu and Puducherry Area. The contract for indigenous design and construction of three Cadet Training Ships was concluded between the Ministry of Defence and L&T on 7 March 2023. The ships will train officer cadets at sea after their basic training ashore, and the facility will also be extended to cadets from friendly foreign countries. The Long Term Integrated Perspective Plan (LTIPP 2012-27) envisages a force level of three Cadet Training Ships.

Key facts

Event
Keel laying of third Cadet Training Ship, Yard 18005
Date and place
30 December 2024, L&T Shipyard, Kattupalli (Tamil Nadu)
Presided by
RAdm Ravi Kumar Dhingra, Flag Officer Tamil Nadu and Puducherry Area
Contract
Three ships; MoD–L&T contract concluded 7 March 2023
Role
Sea training of officer cadets after basic training ashore; also for cadets of friendly foreign countries
Plan
LTIPP 2012-27 envisages three Cadet Training Ships

Practice MCQs 2 questions

Q1

Where was the keel of the Indian Navy's third Cadet Training Ship (Yard 18005) laid on 30 December 2024?

Show answer

Correct answer: B — L&T Shipyard, Kattupalli

PIB (Defence): the keel laying of Yard 18005 was held at M/s L&T Shipyard, Kattupalli, on 30 December 2024.

Q2 Advanced

Consider the following statements about the Indian Navy's Cadet Training Ships: 1. The contract for three such ships was concluded between the Ministry of Defence and L&T on 7 March 2023. 2. The Long Term Integrated Perspective Plan (LTIPP 2012-27) envisages a force level of three Cadet Training Ships. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

PIB (Defence): the contract for three Cadet Training Ships was concluded on 7 March 2023, and LTIPP 2012-27 envisages a force level of three such ships; both statements are correct.

← All current affairs