Steel cut for Indian Navy's first Next Generation Missile Vessel at Cochin Shipyard

The steel cutting ceremony of the first Next Generation Missile Vessel (NGMV) for the Indian Navy was held at Cochin Shipyard Limited, Kochi, on 16 December 2024.

Summary

The steel cutting ceremony of the first Next Generation Missile Vessel (NGMV) for the Indian Navy was held at Cochin Shipyard Limited (CSL), Kochi, on 16 December 2024 in the presence of Cmde S Parthiban, Warship Production Superintendent, Kochi. The contract for construction of six NGMVs was concluded with CSL in March 2023, with induction of the ships into the Indian Navy planned from 2027 onwards. The NGMVs are envisaged as high-speed vessels with Surface to Surface Missile System, Anti-Missile Defence Systems, and Air Surveillance and Fire Control Radars. All the major role-defining equipment has been indigenously developed and manufactured.

Key facts

Event
Steel cutting of first NGMV, 16 December 2024
Shipyard
Cochin Shipyard Limited, Kochi
Contract
Six NGMVs; concluded with CSL in March 2023
Induction
Planned from 2027 onwards
Weapons and sensors
Surface to Surface Missile System, Anti-Missile Defence, Air Surveillance and Fire Control Radars
Indigenisation
Major role-defining equipment indigenously developed

Practice MCQs 2 questions

Q1 Advanced

How many Next Generation Missile Vessels (NGMVs) are covered by the contract concluded with Cochin Shipyard Limited in March 2023?

Show answer

Correct answer: B — 6

PIB (Defence): the contract for construction of six NGMVs was concluded with CSL in March 2023.

Q2 Advanced

From which year is the induction of the Next Generation Missile Vessels into the Indian Navy planned?

Show answer

Correct answer: C — 2027

PIB (Defence): induction of the NGMVs into the Indian Navy is planned from 2027 onwards.