Raksha Mantri approves first large-scale solar power project on defence land at Sitapur, UP

On 9 June 2026, the Defence Ministry announced that Rajnath Singh had approved a 250 MW Solar Power Project with Battery Energy Storage at Sitapur (Ex-Cantonment), Uttar Pradesh, on about 850 acres of vacant defence land.

Summary

Raksha Mantri Rajnath Singh has approved a 250 MW Solar Power Project with Battery Energy Storage System (BESS) at Sitapur (Ex-Cantonment), Uttar Pradesh, on about 850 acres of vacant defence land, the Ministry of Defence announced on 9 June 2026. It is the first project of its kind by the Ministry to develop large-scale solar generation with integrated BESS on defence land. The project will be developed through NTPC under the Ministry's initiative for optimum use of vacant defence land, and is meant to strengthen energy security of defence establishments across UP and cut long-term power costs.

Key facts

Announced
9 June 2026
Capacity
250 MW Solar + BESS
Location
Sitapur (Ex-Cantonment), Uttar Pradesh
Land
~850 acres of vacant defence land
Developer
NTPC
Distinction
First large-scale solar project on defence land

Practice MCQs 3 questions

Q1

Where will the first large-scale solar power project on defence land, approved by the Raksha Mantri in June 2026, be set up?

Show answer

Correct answer: B — Sitapur, Uttar Pradesh

The project will come up at Sitapur (Ex-Cantonment), Uttar Pradesh.

Q2 Advanced

What is the capacity of the Solar-BESS project approved on defence land at Sitapur?

Show answer

Correct answer: D — 250 MW

It is a 250 MW Solar Power Project with Battery Energy Storage System.

Q3 Advanced

Through which entity will the Sitapur Solar-BESS project on defence land be developed?

Show answer

Correct answer: A — NTPC

The project will be developed through NTPC under the Ministry of Defence's initiative for optimum use of vacant defence land.