SF Prep Notes

PM inaugurates Sonamarg (Z-Morh) Tunnel in Jammu and Kashmir

₹2,700 crore-plus project gives all-weather connectivity between Srinagar and Sonamarg en route to Leh.

Summary

Prime Minister Narendra Modi inaugurated the Sonamarg Tunnel, earlier called the Z-Morh tunnel, in Ganderbal district of Jammu and Kashmir on 13 January 2025. The Sonamarg Tunnel project is around 12 km long and was built at a cost of over ₹2,700 crore; it comprises a 6.4 km main tunnel, an egress tunnel and approach roads. Situated at over 8,650 feet above sea level, it gives all-weather connectivity between Srinagar and Sonamarg en route to Leh, bypassing landslide- and avalanche-prone routes. Along with the Zojila Tunnel, due by 2028, it will cut the route from 49 km to 43 km and raise vehicle speed from 30 km/h to 70 km/h on NH-1 between the Srinagar Valley and Ladakh.

Key facts

Date
13 January 2025
Earlier name
Z-Morh tunnel
District
Ganderbal, J&K
Project length
About 12 km; main tunnel 6.4 km
Cost
Over ₹2,700 crore
Altitude
Over 8,650 ft
With Zojila Tunnel (by 2028)
Route 49 km to 43 km; speed 30 to 70 km/h on NH-1

Practice MCQs 3 questions

Q1

The Sonamarg Tunnel, inaugurated by PM Modi on 13 January 2025, was earlier known as:

Show answer

Correct answer: B — Z-Morh tunnel

The Hindu and Indian Express: the tunnel was earlier called the Z-Morh tunnel; Zojila is a separate tunnel due by 2028.

Q2 Advanced

In which district of Jammu and Kashmir is the Sonamarg Tunnel located?

Show answer

Correct answer: C — Ganderbal

The Hindu and Indian Express both place the tunnel in Ganderbal district.

Q3 Advanced

Consider the following statements about the Sonamarg Tunnel project: 1. It was built at a cost of over ₹2,700 crore. 2. Its main tunnel is 6.4 km long. 3. It is situated at an altitude of over 8,650 feet above sea level. Which of the statements given above are correct?

Show answer

Correct answer: D — 1, 2 and 3

PIB (PMO): all three statements are correct.

← All current affairs