Tamil Nadu Current Affairs Quiz — Last 6 months
Daily news by your exam, state and topic — each with a short summary, key facts and MCQs.
Veteran film director Bharathiraja, who died in Chennai on 10 June 2026, was associated with which film industry?
Show answer
Correct answer: D — Tamil
Which was the debut film of director Bharathiraja (died June 2026), regarded as a landmark in Tamil cinema?
Show answer
Correct answer: C — 16 Vayathinile
Which Union Territory signed a reform-linked MoU under Jal Jeevan Mission 2.0 on 2 June 2026?
Show answer
Correct answer: A — Puducherry
Which of the following States was NOT among those that signed reform-linked MoUs under JJM 2.0 on 2 June 2026?
Show answer
Correct answer: D — Kerala
The reform-linked MoUs under Jal Jeevan Mission 2.0 signed in June 2026 mandate which model of rural water governance?
Show answer
Correct answer: B — Gram Panchayat-led, service-based and community-centred model
In May 2026, who was appointed Director-General of Police and Head of the Police Force of Tamil Nadu?
Show answer
Correct answer: D — Mahesh Kumar Aggarwal
Under the Supreme Court guidelines cited for the Tamil Nadu DGP appointment (May 2026), what is the fixed tenure of a State's DGP and Head of Police Force?
Show answer
Correct answer: B — Two years
The 4-lane Thiruvarur Bypass approved in May 2026 lies on which section of NH-83 in Tamil Nadu?
Show answer
Correct answer: C — Nagapattinam–Thanjavur
The Thiruvarur Bypass project is expected to improve connectivity of industrial hubs like Tiruchirappalli and Coimbatore with which port towns?
Show answer
Correct answer: B — Karaikal and Nagapattinam
The ANRF Convergence Research Centres of Excellence announced in May 2026 mainly aim to:
Show answer
Correct answer: C — combine social sciences and humanities with science and technology
'SAṂYoga', one of the ANRF Convergence Research CoEs selected in May 2026, is a Center for Sanskrit, AI, Music and Yoga at which institution?
Show answer
Correct answer: A — IIT Madras
The Kiul–Jhajha third line project approved in May 2026 lies on which railway corridor?
Show answer
Correct answer: B — Howrah–Delhi
What is the length and cost of the Arakkonam–Chengalpattu doubling project approved in May 2026?
Show answer
Correct answer: C — 68 km, ₹993 crore