Up to how much power can India export to Nepal through the MuzaffarpurтАУDhalkebar line under the approval announced on 14 September 2026?
Show answer
Correct answer: D тАФ 600 MW
Up to 600 MW can flow through the MuzaffarpurтАУDhalkebar 400 kV line and up to 54 MW through the TanakpurтАУMahendranagar 132 kV line.
The TanakpurтАУMahendranagar line used for power exports to Nepal starts from which Indian State?
Show answer
Correct answer: C тАФ Uttarakhand
Tanakpur is in Uttarakhand; up to 54 MW will flow through the TanakpurтАУMahendranagar 132 kV line.
Consider the following about the MuzaffarpurтАУDhalkebar transmission line: 1. It is a 400 kV double-circuit line between Bihar and Nepal. 2. It was dedicated jointly by the Prime Ministers of India and Nepal in February 2016. Which of the above is/are correct?
Show answer
Correct answer: C тАФ Both 1 and 2
Both are correct. The 400 kV D/C MuzaffarpurтАУDhalkebar line was commissioned on 19 February 2016 and dedicated by the two Prime Ministers on 20 February 2016.