The 86th meeting of the Network Planning Group under PM GatiShakti, held on 24 January 2025, evaluated two railway and two highway projects, including Vadodara–Ratlam quadrupling.

Summary

The Network Planning Group (NPG) under PM GatiShakti held its 86th meeting on 24 January 2025, chaired by DPIIT Joint Secretary E. Srinivas, and evaluated four projects for conformity with PM GatiShakti principles. The NPG reviewed quadrupling of the 258.94 km Vadodara (Gujarat)–Ratlam (Madhya Pradesh) line, a 48.9 km Murarai–Barharwa third line in West Bengal and Jharkhand, an 80.70 km two-lane upgrade of NH-539 in Madhya Pradesh bypassing Tikamgarh, and a 65 km greenfield four-lane Sultanpur–Ayodhya highway on NH-330 in Uttar Pradesh.

Key facts

Meeting
86th NPG, 24 January 2025
Chair
E. Srinivas, Joint Secretary, DPIIT
Rail 1
Vadodara–Ratlam quadrupling, 258.94 km (Gujarat, MP)
Rail 2
Murarai–Barharwa 3rd line, 48.9 km (WB, Jharkhand)
Road 1
NH-539, 80.70 km two-lane, bypassing Tikamgarh (MP)
Road 2
Sultanpur–Ayodhya greenfield 4-lane, 65 km, NH-330 (UP), HAM

Practice MCQs 2 questions

Q1 Advanced

The 258.94 km railway quadrupling project evaluated at the 86th NPG meeting links Vadodara with which city?

Show answer

Correct answer: D — Ratlam

PIB 2096204: the project adds a third and fourth line between Vadodara (Gujarat) and Ratlam (Madhya Pradesh).

Q2

The Network Planning Group under PM GatiShakti is chaired by an official of which department?

Show answer

Correct answer: A — DPIIT

PIB 2096204: the 86th NPG meeting was chaired by E. Srinivas, Joint Secretary, DPIIT.