Manohar Lal in Nepal: Arun-3 electromechanical works begin; POWERGRID–NEA MoU on cross-border lines

Union Power Minister Manohar Lal inaugurated electromechanical works at the 900 MW Arun-3 project in Nepal and witnessed a POWERGRID–Nepal Electricity Authority MoU on cross-border transmission on 22 April 2025.

Summary

Union Minister of Power and Housing & Urban Affairs Manohar Lal visited Nepal on 22 April 2025 with Nepal's Energy Minister Dipak Khadka. At the 900 MW Arun-3 Hydroelectric Project in Sankhuwasabha district, being developed by SJVN Limited, he inaugurated the start of electromechanical works at the powerhouse. In Kathmandu, POWERGRID and the Nepal Electricity Authority (NEA) signed an MoU for two joint venture companies, one in each country, to build the 400 kV Inaruwa (Nepal)–New Purnea (India) and 400 kV Dododhara (Nepal)–Bareilly (India) double-circuit transmission systems.

Key facts

Visit
Nepal, 22 April 2025
Arun-3
900 MW, Sankhuwasabha district; developer SJVN; electromechanical works begin
MoU
POWERGRID–Nepal Electricity Authority: two JV companies
Lines
400 kV Inaruwa–New Purnea; 400 kV Dododhara–Bareilly

Practice MCQs 2 questions

Q1

What is the capacity of the Arun-3 Hydroelectric Project in Nepal, where electromechanical works began on 22 April 2025?

Show answer

Correct answer: D — 900 MW

Arun-3 is a 900 MW project being developed by SJVN Limited.

Q2 Advanced

Consider the following about India–Nepal energy cooperation on 22 April 2025: 1. The Arun-3 project is being developed by SJVN Limited. 2. POWERGRID and the Nepal Electricity Authority signed an MoU for the 400 kV Inaruwa–New Purnea and Dododhara–Bareilly transmission systems. Which of the statements given above is/are correct?

Show answer

Correct answer: C — Both 1 and 2

Both are correct, as per the Power Ministry release.