Steel cut for Indian Navy's fourth Fleet Support Ship at Hindustan Shipyard

On 19 June 2025, the steel-cutting ceremony of the fourth of five Fleet Support Ships for the Indian Navy was held at Hindustan Shipyard Limited, with Chief of the Naval Staff Adm Dinesh K Tripathi as chief guest.

Summary

The steel-cutting ceremony of the fourth of five Fleet Support Ships (FSS) for the Indian Navy was held at Hindustan Shipyard Limited (HSL) on 19 June 2025, with Chief of the Naval Staff Admiral Dinesh K Tripathi as chief guest. The Navy signed the contract with HSL for five FSS in August 2023, with deliveries starting in mid-2027. The ships, displacing more than 40,000 tons, will replenish fleet ships at sea with fuel, water, ammunition and stores, strengthening the Navy's blue-water capability. In a secondary role they will support humanitarian aid and disaster relief and non-combatant evacuation operations.

Key facts

Ship
4th of 5 Fleet Support Ships
Builder
Hindustan Shipyard Limited
Contract
August 2023; deliveries from mid-2027
Displacement
More than 40,000 tons
Roles
Fleet replenishment at sea; HADR and NEO

Practice MCQs 3 questions

Q1

The steel-cutting ceremony held on 19 June 2025 was for which of the five Fleet Support Ships being built for the Indian Navy?

Show answer

Correct answer: C — Fourth

PIB (Defence): The steel cutting ceremony of the fourth of the five Fleet Support Ships (FSS) was held at HSL on 19 Jun 2025.

Q2 Advanced

Which shipyard is building the five Fleet Support Ships for the Indian Navy?

Show answer

Correct answer: D — Hindustan Shipyard Limited

PIB (Defence): The Indian Navy signed a contract with Hindustan Shipyard Limited (HSL) for acquisition of five Fleet Support Ships in Aug 2023.

Q3 Advanced

Consider the following statements about the Indian Navy's Fleet Support Ships: 1. The contract for five ships was signed in August 2023. 2. Each ship will displace less than 20,000 tons. Which of the statements given above is/are correct?

Show answer

Correct answer: A — 1 only

PIB (Defence): The contract was signed in Aug 2023, and the ships will have a displacement of more than 40,000 tons, not less than 20,000 tons. So the answer is 1 only.