SF Prep Notes

User trials of Extended Range Anti-Submarine Rocket completed from INS Kavaratti

User trials of DRDO's Extended Range Anti-Submarine Rocket (ERASR), carried out from INS Kavaratti from 23 June 2025, were successfully completed on 7 July 2025.

Summary

User trials of the Extended Range Anti-Submarine Rocket (ERASR) were successfully carried out from INS Kavaratti between 23 June and 7 July 2025, the Ministry of Defence said. Designed by DRDO's Armament Research & Development Establishment (ARDE), Pune, with the High Energy Materials Research Laboratory and the Naval Science & Technological Laboratory, ERASR is a fully indigenous anti-submarine rocket fired from the Indigenous Rocket Launcher of naval ships. It uses a twin-rocket-motor configuration and an indigenously developed Electronic Time Fuze. A total of 17 rockets were test-evaluated at different ranges, demonstrating range performance, fuze and warhead functioning. Bharat Dynamics Limited, Hyderabad, and Solar Defence & Aerospace Limited, Nagpur, are the production partners.

Key facts

Trials
23 June–7 July 2025, from INS Kavaratti
Developer
ARDE Pune, with HEMRL and NSTL (DRDO)
Features
Fully indigenous; twin rocket motors; indigenous Electronic Time Fuze; fired from Indigenous Rocket Launcher
Rounds
17 ERASRs evaluated at different ranges
Production partners
Bharat Dynamics Ltd, Hyderabad; Solar Defence & Aerospace Ltd, Nagpur

Practice MCQs 4 questions

Q1

Which DRDO laboratory designed and developed the Extended Range Anti-Submarine Rocket (ERASR)?

Show answer

Correct answer: B — Armament Research & Development Establishment (ARDE), Pune

MoD: DRDO's ARDE, Pune, with HEMRL and NSTL, designed and developed ERASR.

Q2 Advanced

How many ERASRs were test-evaluated during the user trials concluded on 7 July 2025?

Show answer

Correct answer: C — 17

MoD: a total of 17 ERASRs were successfully test evaluated at different ranges.

Q3 Advanced

From which Indian Navy ship were the ERASR user trials of June–July 2025 carried out?

Show answer

Correct answer: D — INS Kavaratti

MoD: user trials of ERASR were successfully carried out from INS Kavaratti from 23 June to 7 July 2025.

Q4 Advanced

Which companies are the production partners for the ERASR?

Show answer

Correct answer: A — Bharat Dynamics Limited, Hyderabad and Solar Defence & Aerospace Limited, Nagpur

MoD: Bharat Dynamics Limited, Hyderabad and Solar Defence & Aerospace Limited, Nagpur are the production partners.

← All current affairs