SF Prep Notes

Assam CM opens ₹99-crore Dinesh Goswami Flyover at Bharalumukh, Guwahati, finished in 15 months

Assam Chief Minister Himanta Biswa Sarma inaugurated the 1.2-km Dinesh Goswami Flyover at Bharalumukh, Guwahati, on 4 March 2026, completed in 15 months against a 24-month target.

Summary

Assam Chief Minister Himanta Biswa Sarma inaugurated the Dinesh Goswami Flyover at Bharalumukh, Guwahati, on 4 March 2026. The 1.2-km flyover, built for about ₹99 crore, starts at Machkhowa and links Bharalumukh with the Santipur Sluice Gate area, passing over a railway crossing. The Chief Minister said the design was finalised after consultations with Indian Railways and the flyover was finished in 15 months against a 24-month deadline. The flyover is named after former Union Minister Dinesh Goswami, and The Sentinel reported that its opening led to the permanent closure of Railway Gate No. 9.

Key facts

Date and place
4 March 2026, Bharalumukh, Guwahati
Length and cost
1.2 km; about ₹99 crore
Route
Machkhowa – Bharalumukh – Santipur Sluice Gate
Timeline
15 months vs 24-month target
Named after
Former Union Minister Dinesh Goswami

Practice MCQs 1 questions

Q1

The Dinesh Goswami Flyover, inaugurated on 4 March 2026, is located in which city?

Show answer

Correct answer: A — Guwahati

The 1.2-km flyover at Bharalumukh, Guwahati, was completed in 15 months against a 24-month target.

← All current affairs