Cabinet clears ₹3,590.73-crore four-laning of NH-22 up to Nepal border in Bihar

The Cabinet Committee on Economic Affairs on 19 August 2026 approved four-laning of the 82.578-km Muzaffarpur-Sitamarhi-Sonbarsa section of NH-22 in Bihar at ₹3,590.73 crore on Hybrid Annuity Mode.

Summary

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on 19 August 2026 approved upgrading the Muzaffarpur-Sitamarhi-Sonbarsa section of NH-22 in Bihar to four lanes. The 82.578-km project will be built on Hybrid Annuity Mode (HAM) at a capital cost of ₹3,590.73 crore. The corridor links the India-Nepal border at Sonbarsa with Muzaffarpur on NH-27 (East-West Corridor) and will also improve access to the Buddhist Circuit and Janaki Punaura Dham temple in Sitamarhi. It is designed for 100 kmph and includes seven major bridges, including a 340-m bridge over the Bagmati river, three rail overbridges and two flyovers.

Key facts

Section
Muzaffarpur-Sitamarhi-Sonbarsa, NH-22 (Bihar)
Length
82.578 km
Cost
₹3,590.73 crore
Mode
Hybrid Annuity Mode (HAM)
Design speed
100 kmph
Structures
7 major bridges (incl. 340 m over Bagmati), 3 ROBs, 2 flyovers

Practice MCQs 3 questions

Q1

What are the cost and length of the Muzaffarpur-Sitamarhi-Sonbarsa NH-22 four-laning approved by the Cabinet on 19 August 2026?

Show answer

Correct answer: C — ₹3,590.73 crore; 82.578 km

The project covers 82.578 km at a total capital cost of ₹3,590.73 crore.

Q2 Advanced

On which mode will the Muzaffarpur-Sitamarhi-Sonbarsa section of NH-22 be developed?

Show answer

Correct answer: A — Hybrid Annuity Mode (HAM)

The CCEA approved the project on Hybrid Annuity Mode (HAM).

Q3 Advanced

Consider the following statements about the NH-22 Muzaffarpur-Sitamarhi-Sonbarsa project: 1. It links the India-Nepal border at Sonbarsa with Muzaffarpur on NH-27 (East-West Corridor). 2. It is designed for a speed of 120 kmph. Which of the above is/are correct?

Show answer

Correct answer: A — 1 only

Only statement 1 is correct. The road is designed for 100 kmph, with an average speed of 80 kmph.