On 10 June 2026, the Union Cabinet approved Phase 2(A) of the Ahmedabad Metro Rail Project, a 6.032 km corridor with five stations linking the city to the airport.

Summary

The Union Cabinet chaired by Prime Minister Narendra Modi approved Phase 2(A) of the Ahmedabad Metro Rail Project (Koteshwar Road to Airport corridor) on 10 June 2026. The 6.032 km corridor will have five stations (four elevated and one underground): Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar and Airport. The completion cost including interest during construction is ₹2,169.04 crore. Once Phase 2(A) is operational, Ahmedabad–Gandhinagar will have 77.63 km of active metro network.

Key facts

Approved
10 June 2026, Union Cabinet
Length
6.032 km
Stations
5 (4 elevated, 1 underground)
Station names
Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar, Airport
Cost
₹2,169.04 crore incl. IDC
Network after 2A
77.63 km Ahmedabad–Gandhinagar

Practice MCQs 3 questions

Q1

Phase 2(A) of the Ahmedabad Metro, approved by the Cabinet on 10 June 2026, connects Koteshwar Road to which destination?

Show answer

Correct answer: C — Airport

Phase 2(A) is the Koteshwar Road to Airport corridor.

Q2 Advanced

What is the length of the Ahmedabad Metro Phase 2(A) corridor approved in June 2026?

Show answer

Correct answer: A — 6.032 km

The corridor is 6.032 km; 77.63 km is the total Ahmedabad–Gandhinagar network once it opens.

Q3 Advanced

Consider the following statements about Ahmedabad Metro Phase 2(A): 1. It will have five stations, of which one is underground. 2. Its completion cost including interest during construction is ₹2,169.04 crore. Which of the statements given above is/are correct?

Show answer

Correct answer: D — Both 1 and 2

Phase 2(A) has five stations (four elevated, one underground) and costs ₹2,169.04 crore including IDC.