Cabinet approves ₹3,653 crore Badvel–Nellore four-lane corridor in Andhra Pradesh

The Cabinet Committee on Economic Affairs on 28 May 2025 approved the 108.134 km four-lane Badvel–Nellore corridor on NH-67 in Andhra Pradesh at a cost of ₹3,653.10 crore in DBFOT mode.

Summary

The Cabinet Committee on Economic Affairs approved the construction of the four-lane Badvel–Nellore corridor in Andhra Pradesh on 28 May 2025, covering 108.134 km at a cost of ₹3,653.10 crore in Design-Build-Finance-Operate-Transfer (DBFOT) mode. The corridor runs from Gopavaram village on NH-67 in YSR Kadapa district to the Krishnapatnam Port junction on NH-16 in SPSR Nellore district. It will connect nodes on three industrial corridors — Kopparthy (Visakhapatnam–Chennai), Orvakal (Hyderabad–Bengaluru) and Krishnapatnam (Chennai–Bengaluru) — and cut the distance to Krishnapatnam Port from 142 km to 108.13 km.

Key facts

Approved
28 May 2025, CCEA
Length / cost
108.134 km; ₹3,653.10 crore
Mode
DBFOT
Route
Gopavaram (NH-67, YSR Kadapa) to Krishnapatnam Port junction (NH-16, SPSR Nellore)
Industrial nodes
Kopparthy (VCIC), Orvakal (HBIC), Krishnapatnam (CBIC)
Distance saved
142 km → 108.13 km

Practice MCQs 3 questions

Q1

In which mode will the Badvel–Nellore four-lane corridor approved on 28 May 2025 be developed?

Show answer

Correct answer: A — DBFOT

The CCEA approved the corridor on Design-Build-Finance-Operate-Transfer (DBFOT) mode.

Q2 Advanced

What is the length of the approved Badvel–Nellore corridor?

Show answer

Correct answer: C — 108.134 km

The corridor is 108.134 km long; it cuts the distance to Krishnapatnam Port from 142 km by 33.9 km.

Q3 Advanced

The Badvel–Nellore corridor will provide strategic connectivity to which port in Andhra Pradesh?

Show answer

Correct answer: B — Krishnapatnam Port

It terminates at the Krishnapatnam Port junction on NH-16 and connects to Krishnapatnam Port, a priority node on the CBIC.